| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a north setback waiver based on a cemented production liner with a wet shoe and ability to frac out the shoe. ๐ Permit Information / Stipulations Indicates a specific, non-standard engineering solution to meet spacing requirements, suggesting a tailored completion design. |
Unknown | Completions / Frac |
| Tier 2 |
Operator asserts it will utilize a wet shoe with ability to frac out the toe. ๐ Proposed Drilling Plan / Casing Details Reiterates a specific completion technique (wet shoe) critical for the approved setback waiver, indicating a planned operational sequence. |
Unknown | Completions / Frac |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval Specifies a named inspector and a pre-construction contact requirement, adding a procedural step and potential scheduling gate. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings to be hauled to WISCO Oilfield Special Waste Landfill. ๐ Proposed Drilling Plan / Disposal of Drill Cuttings Explicitly names a licensed disposal facility, pre-selecting waste hauling and disposal vendor. |
Unknown | General Oilfield Services |