| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval includes condition for a 150' north/south setback based on a production liner cemented in lateral with a wet shoe and ability to frac out the shoe. ๐ STIPULATIONS NDIC Field Order Info Specific engineering condition tied to completion design, indicating a planned wet shoe and liner frac-out. |
Unknown | Completions / Frac |
| Tier 3 |
Operator letter states wells will enter Bakken Petroleum System outside target spacing unit, invoking NDIC Orders 31973 and 31848 for intra-operator notification. ๐ Devon Energy Corporation letter dated September 2nd, 2026 Reveals a non-standard trajectory crossing unit boundaries, triggering specific regulatory notifications. |
2026-09-02 | Drilling Rigs |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction. ๐ Conditions of Approval Construction Commencement Notification Explicit pre-construction contact requirement with a named inspector, adding a regulatory step. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings to be hauled to WISCO Oilfield Special Waste Landfill. ๐ PROPOSED WORK DISPOSAL OF DRILL CUTTINGS Explicitly names a licensed disposal facility for cuttings, pre-selecting a waste vendor. |
Unknown | General Oilfield Services |