๐Ÿ›ข๏ธ ALE 2335-2BHN

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #43444 ยท Generated 2026-11-02 02:39

API
3302301915
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 North setback waiver granted based on production liner cemented in lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ NDIC Field Order Info
Specific engineering design (wet shoe cementation) enabled regulatory exception to standard spacing setbacks.
Unknown Completions / Frac
Tier 3 Operator requested and was granted a waiver from the standard 3-day waiting period after permit publication to commence pad construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval / Affidavit
Demonstrates operator urgency and pre-planning to accelerate pad development timeline.
2025-11-11 Regulatory / Permitting
Tier 3 Well pad located on an aquifer triggers mandatory onsite inspection and stringent site-specific stipulations including closed mud system, no drilling pit, and impermeable liner.
๐Ÿ“„ Permit Information / STIPULATIONS
Imposes non-standard, high-cost environmental controls and requires direct NDIC inspector coordination before construction.
Unknown Mud / Fluids
Tier 3 Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation instead.
๐Ÿ“„ Drilling Plan / Evaluation Program
Non-standard evaluation program reduces conventional wireline logging scope.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental Containment & Liners
Aquifer location mandates impermeable liner for entire location and closed mud system; immediate need upon permit approval.
Directional Drilling / MWD
KLX Directional is named as MWD contractor; complex pad development with anti-collision planning requires precise navigation.
Cementing Services
Specific wet shoe liner cementation design required for setback waiver; detailed cement program outlined for multiple casing strings.
Site Construction & Earthwork
Pad construction must begin after waiver approval; detailed survey and earthwork quantities provided by Uintah Engineering.