| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Lateral will be cemented with a wet shoe designed to be fraced out, a specific completion technique. ๐ Drilling Plan / Completion Program Specifies a deliberate cementing and stimulation design not universal in Bakken completions. |
Unknown | Completions / Frac |
| Tier 3 |
Permit includes aquifer location stipulations requiring closed mud system, impermeable liner, and onsite inspection. ๐ PERMIT INFORMATION / STIPULATIONS Imposes non-standard environmental controls and pre-spud regulatory engagement. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation. ๐ Drilling Plan / Evaluation Program Deviates from standard open-hole logging, indicating a cost or operational optimization strategy. |
Unknown | General Oilfield Services |
| Tier 3 |
Drilling fluid program specifies produced Bakken salt water for the production lateral. ๐ Drilling Plan / Drilling Fluids Program Use of produced water as drilling fluid is a non-routine fluid management choice. |
Unknown | General Oilfield Services |