| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Lateral will be fully cemented using a wet shoe with ability to frac out the toe. ๐ Drilling Plan, Completion Program notes and diagram Specifies a cemented lateral completion design, which is less common than uncemented liners in the Bakken, impacting completion strategy. |
Unknown | Completions / Frac |
| Tier 3 |
Approval conditional on well being drilled in conjunction with another well meeting a 1220' setback from east/west boundaries. ๐ Page 3 of 10 Makes this well's operational timing and legality dependent on the drilling of a companion well with specific placement. |
Unknown | Drilling Rigs |
| Tier 3 |
Well location triggers aquifer-based special stipulations requiring closed mud system, no drilling pit, impermeable liner, and onsite NDIC inspection. ๐ PERMIT INFORMATION / STIPULATIONS Imposes non-standard, prescriptive environmental controls and mandatory inspector coordination, increasing pre-spud complexity and cost. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD data. ๐ Drilling Plan, Section 5: Evaluation Program Deviates from standard regulatory logging suite, indicating confidence in MWD/geosteering and a cost-saving intent. |
Unknown | General Oilfield Services |