| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Lateral will be fully cemented using a wet shoe with ability to frac out the toe, as per north setback condition. ๐ PERMIT INFORMATION / NDIC Field Order Info Specific completion technique mandated by regulatory setback condition, influencing cementing and stimulation design. |
Unknown | Completions / Frac |
| Tier 3 |
Operator asserts it will use produced Bakken salt water as drilling fluid in the 6" production interval. ๐ DRILLING PLAN / Drilling Fluids Program Specifies use of produced water instead of conventional mud, indicating a fluid sourcing and handling plan. |
Relative | Mud / Fluids |
| Tier 3 |
Well location triggers 'SPECIAL ATTENTION' due to aquifer proximity, requiring onsite inspection and closed mud system with impermeable liner. ๐ PERMIT INFORMATION / STIPULATIONS Imposes non-standard, site-specific environmental and operational constraints that increase planning complexity and regulatory oversight. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation instead. ๐ DRILLING PLAN / Evaluation Program Deviates from standard open-hole logging program, indicating a cost/operational design choice that reduces wireline logging scope. |
Relative | General Oilfield Services |