| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback condition based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. π NDIC Field Order Info Specifies a precise completion design (cemented liner with wet shoe) as a condition of approval for boundary setbacks, locking in a specific completion method. |
Unknown | Completions / Frac |
| Tier 3 |
Closed loop system mandated; all drill cuttings to be disposed at 13 Mile Landfill, Williston, ND. π Drilling Plan - Drilling Fluids Program Pre-selects a specific offsite disposal facility and mandates a closed-loop drilling system, dictating waste handling logistics. |
Unknown | Mud / Fluids |
| Tier 3 |
Well pad located on an aquifer triggers mandatory onsite inspection and closed mud system with impermeable liner. π PERMIT INFORMATION / STIPULATIONS Imposes strict environmental controls and requires NDIC Field Inspector involvement before construction, adding regulatory steps and potential for site-specific stipulations. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must wait 3rd business day after permit publication before commencing operations unless Director waives.β° TIME-SENSITIVE π Conditions of Approval Introduces a mandatory waiting period that can delay spud, affecting rig scheduling and pad timing unless a waiver is actively sought. |
Relative | Drilling Rigs |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation. π Drilling Plan - Evaluation Program Non-routine data acquisition strategy reduces open-hole logging, shifting focus to MWD and cased-hole logs, which may affect service mix. |
Unknown | General Oilfield Services |