Completion plan specifies a fully cemented production liner with a 'wet shoe with the ability to frac out the toe' and stimulation via 'multiple stage hydraulic frac treatment consisting of slick water and sand' pumped down the 7" casing. ๐ Drilling Plan - Completion Program (Page 5) The wet shoe completion design is a specific operational choice that dictates cementing and perforation strategies, differing from standard plug-and-perf or stage tool methods. |
2026-08-18 | Completions / Frac |
| Tier 3 |
Well pad is located on an aquifer, triggering mandatory 'Special Attention' stipulations including a Closed Mud System, no drilling pit, and an impermeable liner for the entire location.โฐ TIME-SENSITIVE ๐ Permit Stipulations (Page 1) This is a high-cost, non-negotiable environmental control requirement that dictates specific drilling fluid systems and location construction before spud. |
2026-11-04 | Mud / Fluids |
| Tier 3 |
The directional drilling and well planning contractor 'KLX Directional' is explicitly named in the MWD contractor field and is the author of the detailed 'KLX Well Planning Report' dated August 18, 2026. ๐ Drilling Plan - Evaluation Program (Page 5) The contractor is pre-selected and deeply integrated into the well design phase, as evidenced by their comprehensive planning report included in the permit file. |
2026-08-18 | Directional Drilling |
| Tier 3 |
Operator declares intent to submit a sundry notice to waive open-hole logs, planning to rely on MWD and cased-hole evaluation logs instead.โฐ TIME-SENSITIVE ๐ Drilling Plan - Evaluation Program (Page 5) This is a deliberate deviation from routine logging programs, indicating a cost or operational strategy that shifts service demand from open-hole logging contractors to cased-hole specialists. |