๐Ÿ›ข๏ธ FRAZIER 161-97-10-12H-1

HUNT OIL COMPANY ยท Divide County, ND ยท File #43463 ยท Generated 2026-11-10 02:05

API
3302301924
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on a 1220' setback from north/south and 150' from east/west boundaries within a 1920-acre unit, with east setback based on a cemented production liner and wet shoe for frac-out.
๐Ÿ“„ Permit Information / Stipulations
Unusually specific and restrictive boundary setbacks tied to a particular completion design (wet shoe) indicate heightened regulatory scrutiny and a non-standard lateral containment plan.
Unknown Completions / Frac
Tier 3 Wellbore will enter the Bakken Pool in an adjacent spacing unit (Sec 9), triggering NDIC Order 31848 requirements; affidavit confirms Formentera Operations, LLC was sent drilling and completion plans.
๐Ÿ“„ Affidavit of Chelsea Cherry
Evidence of active cross-unit coordination and regulatory compliance for a wellbore traversing into an offset operator's unit, revealing operational complexity and inter-operator engagement.
2026-10-28 Drilling Rigs
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location construction and notify immediately upon spudding.
๐Ÿ“„ Conditions of Approval
Explicit, personal point of contact (Robert Stafford) for pre-construction and spud notification indicates heightened regulatory oversight and a required sequence of field interactions.
Relative General Oilfield Services
Tier 3 Open hole logs (porosity/resistivity) required from KOP to base of surface casing; CBL required on 9-5/8" intermediate and 7" casing.
๐Ÿ“„ Conditions of Approval
Mandates specific logging intervals and cement bond logs beyond typical requirements, indicating a focus on wellbore integrity and data acquisition in the upper hole.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Survey Management
Detailed directional plan from Scientific Drilling is already in place; spudding requires immediate survey submission to certsurvey@nd.gov per permit conditions.
Civil Earthwork & Pad Construction
Detailed pad design with 35,080 CY excavation and specific grading plans by KLJ Engineering indicates imminent or recent pad construction activity, requiring heavy equipment and earthmoving contractors.
Wireline & Logging
Permit mandates specific open-hole logs from KOP to surface casing and CBLs on intermediate and production casing, creating immediate service requirements upon reaching those depths.
Regulatory & Land Coordination
The affidavit and permit conditions show active coordination with offset operator Formentera and NDIC inspector Robert Stafford, indicating ongoing need for land/regulatory support to maintain schedule.