| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on a 1220' setback from north/south and 150' from east/west boundaries within a 1920-acre unit, with east setback based on a cemented production liner and wet shoe for frac-out. ๐ Permit Information / Stipulations Unusually specific and restrictive boundary setbacks tied to a particular completion design (wet shoe) indicate heightened regulatory scrutiny and a non-standard lateral containment plan. |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore will enter the Bakken Pool in an adjacent spacing unit (Sec 9), triggering NDIC Order 31848 requirements; affidavit confirms Formentera Operations, LLC was sent drilling and completion plans. ๐ Affidavit of Chelsea Cherry Evidence of active cross-unit coordination and regulatory compliance for a wellbore traversing into an offset operator's unit, revealing operational complexity and inter-operator engagement. |
2026-10-28 | Drilling Rigs |
| Tier 3 |
Operator must contact NDIC Field Inspector Robert Stafford prior to location construction and notify immediately upon spudding. ๐ Conditions of Approval Explicit, personal point of contact (Robert Stafford) for pre-construction and spud notification indicates heightened regulatory oversight and a required sequence of field interactions. |
Relative | General Oilfield Services |
| Tier 3 |
Open hole logs (porosity/resistivity) required from KOP to base of surface casing; CBL required on 9-5/8" intermediate and 7" casing. ๐ Conditions of Approval Mandates specific logging intervals and cement bond logs beyond typical requirements, indicating a focus on wellbore integrity and data acquisition in the upper hole. |
Unknown | General Oilfield Services |