| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a specific condition for a production liner cemented in the lateral with a wet shoe to allow 'frac out the shoe', indicating a planned, engineered completion technique. ๐ Page 1, 'Conditions of Approval' This is a non-standard, operator-specific completion design requiring precise cementing and perforation strategy. |
Unknown | Completions / Frac |
| Tier 3 |
The well is part of the 14,029-acre Alger-Bakken Unit, governed by Order No. 35122, and a federal permit may be required, prompting a directive to contact the BLM.โฐ TIME-SENSITIVE ๐ Page 6, 'COMPLETION INTERVALS' and Email from Doug Jackson dated 'Thu 11/5/2026' Highlights a large-scale unitized operation and an additional federal regulatory layer (BLM) that must be satisfied, adding complexity and potential delay. |
2026-11-05 | General Oilfield Services |
| Tier 3 |
Affidavit signed Sept 28, 2026, affirms no diesel fuel will be used in hydraulic fracturing for this and five other Cottonwood wells on the pad. ๐ Affidavit section, 'AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS' A formal, sworn document binding the operator to a specific, non-routine fluid constraint for a multi-well pad. |
2026-09-28 | Completions / Frac |
| Tier 3 |
Permit approval is conditional on a 3-business-day waiting period after publication, with a named NDIC Field Inspector (Dylan Roach) for pre-construction contact. ๐ Page 2, 'Construction Commencement Notification' and 'Conditions of Approval' Introduces a specific regulatory checkpoint and a named individual as a gatekeeper for location construction, adding a step before spud. |
Unknown | General Oilfield Services |