๐Ÿ›ข๏ธ Cottonwood 103-3422H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43472 ยท Generated 2026-11-12 01:51

API
3306105730
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit approval includes a condition for a 150' north/south and 500' east/west setback within the Alger-Bakken Unit, with the north setback based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
๐Ÿ“„ Page 1, STIPULATIONS section
The setback condition is tied to a specific completion design (cemented liner with wet shoe) and an explicit intent to frac out the shoe, indicating a non-routine operational plan approved by the regulator.
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Construction Commencement Notification
A pre-construction contact with a named inspector is a specific, non-routine procedural requirement, indicating heightened regulatory oversight for this pad.
Relative General Oilfield Services
Tier 3 A perimeter berm is required surrounding the entire location.
๐Ÿ“„ Page 2, Conditions of Approval
A full perimeter berm is a specific, non-standard site containment requirement beyond typical pad design.
Unknown General Oilfield Services
Tier 3 EOG requests permission to frac out the toe of the production liner.
๐Ÿ“„ Drilling Plan, Cementing Program notes for 4 1/2" Production Liner
Explicitly declared intent to stimulate the toe of the well (via a burst plug) is a specific completion design choice stated in the operational plan.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Pad Building
Permit is approved (11/10/2026) with specific conditions (perimeter berm, impermeable dikes, pre-construction inspector contact). Construction is the next imminent phase.
Cementing & Downhole Tools
The approved drilling plan specifies a cemented liner with a wet shoe and an intent to frac out the toe, requiring specialized cement blends and toe-initiation tools.
Hydraulic Fracturing
The operator has declared intent to fracture the well (including the toe) and the permit is approved, placing fracturing as a near-term post-drilling activity.
Surveying & Geomatics
The complex, long-reach well path and regulatory setback requirements necessitate precise wellbore placement and monitoring, with a named vendor (KLJ) already engaged.