๐Ÿ›ข๏ธ Cottonwood 17-3422H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43473 ยท Generated 2026-11-12 01:52

API
3306105731
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Drilling plan includes a 'wet shoe' at TD and a request to 'frac out the toe', indicating a planned open-hole completion technique.
๐Ÿ“„ Drilling Plan / 4 1/2" Production Liner & Cementing Notes
Describes a non-standard liner cementing and completion method requiring specific frac initiation.
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach prior to location construction, specifying a named individual.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 - Construction Commencement Notification
Unusual specificity of inspector contact for pre-construction, indicating heightened oversight or a particular site condition.
Relative General Oilfield Services
Tier 3 Permit approval includes condition to frac out the shoe of the production liner, indicating a specific completion technique.
๐Ÿ“„ Permit Information / NDIC Field Order Info
Explicit regulatory condition tied to the well's mechanical design and completion approach.
Unknown Completions / Frac
Tier 3 Permit includes a maximum legal coordinate constraint from the well head at TD: 16471' north, based on lateral azimuth.
๐Ÿ“„ Page 2 - Conditions of Approval
A specific, calculated spatial constraint governing the well path, beyond standard setbacks.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
The approved directional plan with specific azimuths, kick-off points, and a long lateral (~16,000 ft north displacement) requires precise execution. Survey frequency requirements are explicitly stated.
Hydraulic Fracturing & Completion
The permit condition to 'frac out the shoe' and the drilling plan's 'wet shoe' design with a request to 'frac out the toe' indicate a specific, planned stimulation operation soon after drilling.
Civil Construction & Site Preparation
The detailed pad design by KLJ Engineering with cut/fill volumes, dike specifications, and a mandatory pre-construction inspector call indicates imminent ground disturbance and pad build-out.
Cementing
Detailed cementing programs with named Halliburton slurry systems for each casing string indicate advanced planning for these services.