๐Ÿ›ข๏ธ Cottonwood 108-3422H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43474 ยท Generated 2026-11-12 01:53

API
3306105732
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Approval conditional on 150' north/south and 500' east/west setbacks within Alger-Bakken Unit, with north setback based on cemented production liner and ability to frac out shoe.
๐Ÿ“„ Permit Information, NDIC Field Order Info
Imposes specific, non-standard geometric constraints on wellbore placement and completion design within a large unitized area.
Unknown Completions / Frac
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspector Dylan Roach at a direct phone number.
๐Ÿ“„ Page 2, Construction Commencement Notification
Specifies a named individual regulator as a required point of contact, indicating a heightened or personalized regulatory oversight for this pad.
Relative General Oilfield Services
Tier 3 Permit includes a specific, detailed H2S contingency plan referencing the Mission Canyon Formation as an anticipated H2S zone.
๐Ÿ“„ Section 1 Geological Formations, Other Information
Explicitly plans for and documents H2S hazard mitigation for a specific non-target formation, indicating operational risk management.
Unknown General Oilfield Services
Tier 3 EOG requests permission to 'frac out the toe' using a burst plug and 5 bbls of fluid after wiper plug bumps, indicating a specific open-hole completion technique.
๐Ÿ“„ 4 1/2" Production Liner & Cementing notes
Describes a precise, non-standard method to initiate fractures at the toe of the lateral, deviating from standard plug-and-perf.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
The detailed directional plan with specific survey requirements (100' vertical, 30' curve, 90' lateral) and the use of 'Superior MWD+IFR1+SAG+F' tool indicates immediate need for precise wellbore placement services.
Completion & Stimulation
The conditional approval based on the 'ability to frac out the shoe' and the explicit 'frac out the toe' design creates a direct, non-routine opportunity for specialized stimulation and open-hole completion services upon drilling completion.
Pad Construction & Civil Engineering
The permit includes detailed pad construction data, cut/fill volumes, and a mandatory pre-construction inspector call, indicating imminent site work requiring earthmoving and civil contractors.