๐Ÿ›ข๏ธ Cottonwood 20-3422H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43475 ยท Generated 2026-11-13 01:43

API
3306105733
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within Alger-Bakken Unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Permit Information / Stipulations
Imposes specific, non-standard geometric constraints on the wellbore and completion design, requiring precise engineering to comply with unit boundaries.
Unknown Directional Drilling
Tier 2 EOG requests permission to frac out the toe (wet shoe).
๐Ÿ“„ Drilling Plan / Production Liner & Cementing Notes
Explicitly seeks regulatory approval for a specific completion technique (frac'ing out a wet shoe), indicating a non-standard liner completion design.
Unknown Completions / Frac
Tier 3 Permit applications flagged as potentially subject to a Federal permit within the Alger-Bakken Unit spacing unit, requiring contact with BLM Dickinson office.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from NDIC (Outlook)
Introduces a federal permitting layer and inter-agency coordination requirement not present in all state permits.
2026-11-05 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach prior to location construction.
๐Ÿ“„ Conditions of Approval
Specifies a named field inspector as a mandatory pre-construction contact point, indicating heightened regulatory oversight for this pad.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
The permit imposes strict 150'/500' setbacks within the unit, requiring precise wellbore placement. The directional plan is complex with a long lateral (~15,000 ft), and surveys must be submitted at specified frequencies to certsurvey@nd.gov.
Stimulation & Completion
Operator explicitly plans to 'frac out the toe' of a cemented liner with a wet shoe, a specific technique requiring regulatory approval and specialized engineering. A multi-well affidavit also confirms hydraulic fracturing plans for this pad.
Civil Construction & Earthwork
Detailed pad construction data (excavation, embankment volumes) and a mandatory pre-construction call to the NDIC inspector indicate imminent site work. The pad is part of a multi-well development ('Ross 5 NWNW').
Regulatory & Permitting
The permit is flagged for potential federal BLM oversight, adding a layer of complexity. The operator must also provide 21-31 day frac notices to offset operators, creating a defined window for coordination and service scheduling.