| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback approval based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe. ๐ Permit stipulations Specific completion design ('wet shoe') is cited as a regulatory condition for boundary setback. |
2026-11-10 | Completions / Frac |
| Tier 3 |
Permit approval conditional on wellbore being located down north-south axis within 500' drilling corridor and no closer than 150' setback from north & south boundaries of a 5120-acre spacing unit. ๐ Permit stipulations Imposes precise directional and positional constraints on the lateral, affecting well placement and anti-collision planning. |
2026-11-10 | Directional Drilling |
| Tier 3 |
Permit application is within a spacing unit that may be subject to a Federal permit; operator instructed to contact BLM Dickinson.โฐ TIME-SENSITIVE ๐ Email from NDIC engineer Additional federal (BLM) review may be required beyond state permit. |
2026-11-10 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Permit conditions Mandatory pre-construction field inspection creates a gate before pad work can begin. |
2026-11-10 | General Oilfield Services |
| Tier 3 |
Operator requests waiver of adjacent operator notification for off-lease drilling because Oasis is the operator of the adjacent spacing unit. ๐ Operator letter Regulatory waiver sought and likely granted, streamlining the process for drilling into adjacent unit. |
2026-09-02 | Regulatory / Permitting |