| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition requires wellbore to be within north-south axis of 500' corridor and 150' setback, based on a 'wet shoe' cemented liner configuration ๐ NDIC Field Order Info Drilling plan is constrained by a specific cemented liner design ('wet shoe') intended to enable cheaper toe initiation, affecting well path and completion strategy. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver requested for adjacent operator notification as Oasis is the operator of the adjacent spacing unit ๐ Letter dated September 2nd, 2026 Shows operator leveraging its own contiguous acreage to streamline regulatory process for multi-well pad. |
2026-09-02 | Regulatory / Permitting |
| Tier 3 |
Mandatory onsite inspection and closed mud system with impermeable liner due to aquifer location ๐ PERMIT INFORMATION / STIPULATIONS Imposes specific, non-routine environmental and operational constraints requiring inspector coordination and specialized containment. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Construction Commencement Notification Names a specific field inspector for pre-construction coordination, indicating a required point of contact and potential for site-specific stipulations. |