๐Ÿ›ข๏ธ Potter 4595 33-29 2BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43480 ยท Generated 2026-11-20 04:47

API
3302505261
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval condition requires wellbore to be within north-south axis of 500' corridor and 150' setback, based on a 'wet shoe' cemented liner configuration
๐Ÿ“„ NDIC Field Order Info
Drilling plan is constrained by a specific cemented liner design ('wet shoe') intended to enable cheaper toe initiation, affecting well path and completion strategy.
Unknown Completions / Frac
Tier 3 Waiver requested for adjacent operator notification as Oasis is the operator of the adjacent spacing unit
๐Ÿ“„ Letter dated September 2nd, 2026
Shows operator leveraging its own contiguous acreage to streamline regulatory process for multi-well pad.
2026-09-02 Regulatory / Permitting
Tier 3 Mandatory onsite inspection and closed mud system with impermeable liner due to aquifer location
๐Ÿ“„ PERMIT INFORMATION / STIPULATIONS
Imposes specific, non-routine environmental and operational constraints requiring inspector coordination and specialized containment.
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification
Names a specific field inspector for pre-construction coordination, indicating a required point of contact and potential for site-specific stipulations.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Site Construction
Mandatory aquifer protection measures (closed mud system, liner) require immediate contractor engagement before pad construction can start, as inspector sign-off is required.
Directional Drilling & Surveying
Complex well path constrained by regulatory corridor and anti-collision with existing wells; pre-selected surveyor (4DIMENSION) indicates planning phase is active.
Waste Hauling & Disposal
Operator has pre-identified a shortlist of licensed cuttings disposal facilities, creating opportunity for haulers serving those specific sites.
Cementing & Completions
Planned 'wet shoe' cement design for the production liner dictates specific cementing services and creates opportunity for wireline perforating for the first stage.