| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
U-turn horizontal well with specific fracture stimulation approval required for portions closer than 500 ft to spacing unit boundary. ๐ Permit Information / Stipulations Non-standard wellbore geometry triggers a pre-approval process for fracture stimulation, indicating a complex completion design to manage proximity to boundaries. |
Unknown | Completions / Frac |
| Tier 3 |
Pre-spud notification required to specific NDIC Field Inspector (Dylan Roach) prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval Points to a named inspector for pre-construction contact, indicating heightened regulatory oversight or site-specific coordination. |
Unknown | General Oilfield Services |
| Tier 3 |
Approval to drill lateral portions with conditional setbacks, including an apex allowed without regard for parallel boundary setback. ๐ NDIC Field Order Info Regulatory exception granted for the apex of the U-turn well, permitting closer proximity than standard 500-ft setback, reflecting negotiated design. |
Unknown | Completions / Frac |
| Tier 3 |
Mandatory core and sample submission protocol with strict timelines (30 days for cuttings, 180 days for cores). ๐ RE: CORES AND SAMPLES letter Explicit, detailed requirements for sample collection, preparation, and shipment to state library, backed by civil penalty threat. |
Unknown | General Oilfield Services |
| Tier 3 |
Production allocation to multiple spacing units based on actual completed lateral footage within each unit. ๐ Permit Information / Stipulations Well traverses multiple 1280-acre units (Sections 26, 27, 34, 35), requiring allocation based on surveyed lateral footage, not standard per-well production. |
Unknown | General Oilfield Services |