โ† Back to Daily Permits

๐Ÿ›ข๏ธ EN-Lee- 157-93-2627H-1U

HESS BAKKEN INVESTMENTS II LLC ยท Mountrail County, ND ยท File #43482 ยท Generated 2026-11-20 04:49

API
3306105734
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 U-turn horizontal well with specific fracture stimulation approval required for portions closer than 500 ft to spacing unit boundary.
๐Ÿ“„ Permit Information / Stipulations
Non-standard wellbore geometry triggers a pre-approval process for fracture stimulation, indicating a complex completion design to manage proximity to boundaries.
Unknown Completions / Frac
Tier 3 Pre-spud notification required to specific NDIC Field Inspector (Dylan Roach) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Points to a named inspector for pre-construction contact, indicating heightened regulatory oversight or site-specific coordination.
Unknown General Oilfield Services
Tier 3 Approval to drill lateral portions with conditional setbacks, including an apex allowed without regard for parallel boundary setback.
๐Ÿ“„ NDIC Field Order Info
Regulatory exception granted for the apex of the U-turn well, permitting closer proximity than standard 500-ft setback, reflecting negotiated design.
Unknown Completions / Frac
Tier 3 Mandatory core and sample submission protocol with strict timelines (30 days for cuttings, 180 days for cores).
๐Ÿ“„ RE: CORES AND SAMPLES letter
Explicit, detailed requirements for sample collection, preparation, and shipment to state library, backed by civil penalty threat.
Unknown General Oilfield Services
Tier 3 Production allocation to multiple spacing units based on actual completed lateral footage within each unit.
๐Ÿ“„ Permit Information / Stipulations
Well traverses multiple 1280-acre units (Sections 26, 27, 34, 35), requiring allocation based on surveyed lateral footage, not standard per-well production.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Complex U-turn well with strict anti-collision requirements and certified survey submissions needed immediately upon reaching TD; Scientific Drilling already engaged.
Stimulation & Completions Engineering
Fracture stimulation requires prior approval for boundary-proximal sections; Halliburton is the named supplier, but design must accommodate regulatory conditions.
Sample & Core Handling
Mandatory sample collection and shipment within 30/180 days post-drilling creates a time-bound logistics and preparation service opportunity.
Civil Construction & Surveying
Pad construction requires pre-construction notification to a specific inspector; KLJ is providing civil and survey work, indicating ongoing pad development.