โ† Back to Daily Permits

๐Ÿ›ข๏ธ REBA 18-7-6 3H

Phoenix Operating LLC ยท Burke County, ND ยท File #43496 ยท Generated 2026-11-20 04:56

API
3301302096
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Operator must file a Sundry Notice within 3 business days of spudding, requiring details on drilling contractor and rig number.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations / Page 2
This is a regulatory deadline that forces rapid reporting and formalizes the drilling contractor selection immediately upon spud.
2026-11-17 Drilling Rigs
Tier 3 Mandated anti-collision and frac design precautions due to wellbore crossing within 89 feet of an existing producer.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations / SPECIAL ATTENTION
A direct wellbore crossing with a 89-foot separation imposes non-standard, high-risk operational constraints for both drilling and stimulation.
2026-11-17 Directional Drilling
Tier 3 Drill cuttings are contractually designated for disposal at Smoky Butte Environmental LLC.
๐Ÿ“„ Proposed Drilling Plan / DISPOSAL OF DRILL CUTTINGS
The operator has pre-selected a specific disposal facility, eliminating competitive bidding for this service on this well.
2026-11-17 General Oilfield Services
Tier 3 Operator has formally requested a waiver from backbuild order notification requirements for a 5-well pad.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Meaghan Coughlan dated October 8th, 2026
The waiver request is for multiple wells, indicating a coordinated pad development strategy that hinges on regulatory approval to proceed as planned.
2026-10-08 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
The approved permit mandates extreme precision due to a wellbore crossing within 89 feet, requiring advanced anti-collision planning and real-time monitoring.
Hydraulic Fracturing Design & Engineering
The regulatory stipulation explicitly requires frac job design to avoid adversely affecting the nearby existing well, indicating a need for specialized, non-standard fracture modeling and execution.
Waste Hauling & Disposal
The drilling plan explicitly names Smoky Butte Environmental LLC as the disposal facility, indicating a contracted service opportunity for hauling drill cuttings.
Civil Construction & Earthwork
Detailed pad construction plans with specific earthwork quantities and a required perimeter berm indicate imminent or recent construction activity.