| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Mandated anti-collision precautions for drilling and frac design due to wellbore crossing within 94 feet of an existing producer.โฐ TIME-SENSITIVE ๐ Permit Stipulations section Extremely close proximity (94') to an existing wellbore imposes non-standard, high-risk operational constraints for both drilling and stimulation phases. |
2026-11-17 | Directional Drilling |
| Tier 3 |
Drill cuttings disposal contractor explicitly named: 'hauled to a licensed disposal facility, Smoky Butte Environmental LLC'. ๐ Proposed Drilling Plan, Disposal section Operator has pre-selected a specific vendor for waste disposal, which is a contracted service not always specified in permits. |
2026-11-17 | General Oilfield Services |
| Tier 3 |
Operator actively sought and justified a waiver from 'Backbuild Order' notification requirements for a 5-well pad. ๐ Operator waiver request letter Demonstrates operator persistence in navigating regulatory hurdles for a specific pad development plan involving wells entering the unit from outside. |
2026-10-08 | Regulatory / Permitting |
| Tier 3 |
Detailed pad construction plan with ~31,450 cu yds of excavation and ~23,850 cu yds of fill specified.โฐ TIME-SENSITIVE ๐ Engineering drawings (Typical Cross Sections and Quantities) Substantial, quantified earthwork is a prerequisite for drilling, indicating a near-term service window for civil construction contractors. |
Relative | General Oilfield Services |