๐Ÿ›ข๏ธ REBA 18-7-6 4H

Phoenix Operating LLC ยท Burke County, ND ยท File #43497 ยท Generated 2026-11-20 04:58

API
3301302097
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Mandated anti-collision precautions for drilling and frac design due to wellbore crossing within 94 feet of an existing producer.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations section
Extremely close proximity (94') to an existing wellbore imposes non-standard, high-risk operational constraints for both drilling and stimulation phases.
2026-11-17 Directional Drilling
Tier 3 Drill cuttings disposal contractor explicitly named: 'hauled to a licensed disposal facility, Smoky Butte Environmental LLC'.
๐Ÿ“„ Proposed Drilling Plan, Disposal section
Operator has pre-selected a specific vendor for waste disposal, which is a contracted service not always specified in permits.
2026-11-17 General Oilfield Services
Tier 3 Operator actively sought and justified a waiver from 'Backbuild Order' notification requirements for a 5-well pad.
๐Ÿ“„ Operator waiver request letter
Demonstrates operator persistence in navigating regulatory hurdles for a specific pad development plan involving wells entering the unit from outside.
2026-10-08 Regulatory / Permitting
Tier 3 Detailed pad construction plan with ~31,450 cu yds of excavation and ~23,850 cu yds of fill specified.โฐ TIME-SENSITIVE
๐Ÿ“„ Engineering drawings (Typical Cross Sections and Quantities)
Substantial, quantified earthwork is a prerequisite for drilling, indicating a near-term service window for civil construction contractors.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
Critical need for precise wellbore placement and anti-collision monitoring due to the mandated 94' crossing of an existing well. Drilling must commence after permit publication and a 3-day wait (or waiver).
Hydraulic Fracturing Design & Engineering
Frac design must be engineered to 'not adversely affect' the nearby WARD LAKE wellbore, requiring specialized modeling and potentially modified pump schedules.
Civil Construction & Earthwork
A large, engineered pad with specific excavation and fill quantities needs to be built. Construction must be notified to inspector Jason Hicks prior to starting.
Waste Hauling & Disposal
Contract is pre-defined to use Smoky Butte Environmental LLC for drill cuttings, creating a locked-in opportunity once drilling starts.
Cementing
Complex cement program with specific blends and a required top job for surface casing. The production liner uses a wet shoe design, requiring precise execution.