| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Conditional permit approval requiring a companion well to justify spacing unit ๐ Conditions of Approval (Page 2) Permit is conditional on drilling this well in conjunction with another well meeting specific setback requirements. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
Off-spacing drilling from a pad with executed surface use agreement affidavit ๐ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT The operator is drilling four wells from a surface location outside their target spacing unit, requiring a formal affidavit of surface use agreement with the landowner. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
Waiver request for backbuild order notification requirementsโฐ TIME-SENSITIVE ๐ Letter dated June 9th, 2026 Operator formally requests waiver from notifying adjacent spacing unit operator, as they are the offset operator themselves. |
2026-06-09 | Regulatory / Permitting |
| Tier 3 |
Pre-construction notification required to specific NDIC Field Inspectorโฐ TIME-SENSITIVE ๐ Construction Commencement Notification Operator must contact a named inspector (Monica Bleess) prior to location construction, adding a specific regulatory checkpoint. |
Unknown | General Oilfield Services |