| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Off-spacing drilling from a multi-well pad with executed surface use agreement affidavit covering four wells. ๐ Affidavit of Surface Damage Agreement Demonstrates proactive land management and regulatory compliance for a multi-well development plan outside standard spacing units. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
Use of a wet shoe with the ability to frac out the toe, backed up by a hydraulic toe sleeve, as a specific completion design feature. ๐ Proposed Drilling Plan notes Describes a specific, redundant wellbore isolation and stimulation access design, indicating a planned completion technique. |
Unknown | Completions / Frac |
| Tier 3 |
Explicit requirement for a closed mud system with no cuttings pit and hauling of all drill cuttings to a specific licensed disposal facility. ๐ Stipulations and Proposed Drilling Plan Specifies a non-standard waste handling method and names the disposal vendor, locking in a specific service requirement. |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory pre-construction notification to a specific NDIC Field Inspector (Monica Bleess) prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations Adds a specific, named regulatory checkpoint before pad construction can begin, indicating heightened oversight or site-specific conditions. |
Relative | General Oilfield Services |