๐Ÿ›ข๏ธ MACHETE 14-23-26-35 2H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43499 ยท Generated 2026-11-20 04:59

API
3305310933
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Off-spacing drilling from a multi-well pad with executed surface use agreement affidavit covering four wells.
๐Ÿ“„ Affidavit of Surface Damage Agreement
Demonstrates proactive land management and regulatory compliance for a multi-well development plan outside standard spacing units.
2026-11-18 General Oilfield Services
Tier 3 Use of a wet shoe with the ability to frac out the toe, backed up by a hydraulic toe sleeve, as a specific completion design feature.
๐Ÿ“„ Proposed Drilling Plan notes
Describes a specific, redundant wellbore isolation and stimulation access design, indicating a planned completion technique.
Unknown Completions / Frac
Tier 3 Explicit requirement for a closed mud system with no cuttings pit and hauling of all drill cuttings to a specific licensed disposal facility.
๐Ÿ“„ Stipulations and Proposed Drilling Plan
Specifies a non-standard waste handling method and names the disposal vendor, locking in a specific service requirement.
Unknown Mud / Fluids
Tier 3 Mandatory pre-construction notification to a specific NDIC Field Inspector (Monica Bleess) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations
Adds a specific, named regulatory checkpoint before pad construction can begin, indicating heightened oversight or site-specific conditions.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork & Pad Construction
Approved permit with stipulation to contact inspector prior to construction; detailed earthwork quantities (59,860 Cu. Yds.) and pad plans provided indicate imminent site work.
Drilling Waste Logistics
Mandated use of closed-loop system and hauling to a specific landfill creates an immediate, non-discretionary service contract upon spud.
Directional Drilling Services
Detailed directional plan from Taktikal Directional exists; spud notification requires naming the drilling contractor, suggesting imminent contracting for drilling execution.