| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Operator must contact NDIC Field Inspector Monica Bleess prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Stipulations Pre-construction notification to a named inspector is a specific, actionable condition beyond standard permit approval. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
All drill cuttings shall be hauled to Select Water Solutions, LLC Special Waste Landfill at 13195 26th St NW Arnegard, ND 58835. ๐ Proposed Drilling Plan Pre-selection of a specific waste disposal contractor is a non-routine, binding operational plan. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
Surface use agreement obtained for drilling multiple off-spacing wells from the MORRIS-MACHETE Pad. ๐ Affidavit of Surface Damage Agreement The affidavit confirms a critical path item (surface access) is resolved for four off-spacing wells, enabling pad development. |
2026-11-18 | General Oilfield Services |
| Tier 3 |
Operator requests waiver of backbuild order notification for offset operator Phoenix Energy, as they are the same company. ๐ Backbuild Order Waiver Letter A formal, pre-permit waiver request for intra-company drilling simplifies regulatory compliance for a multi-well pad. |
2026-06-09 | Regulatory / Permitting |