โ† Back to Daily Permits

๐Ÿ›ข๏ธ MACHETE 14-23-26-35 3H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43500 ยท Generated 2026-11-20 05:00

API
3305310934
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Operator must contact NDIC Field Inspector Monica Bleess prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Pre-construction notification to a named inspector is a specific, actionable condition beyond standard permit approval.
2026-11-18 General Oilfield Services
Tier 3 All drill cuttings shall be hauled to Select Water Solutions, LLC Special Waste Landfill at 13195 26th St NW Arnegard, ND 58835.
๐Ÿ“„ Proposed Drilling Plan
Pre-selection of a specific waste disposal contractor is a non-routine, binding operational plan.
2026-11-18 General Oilfield Services
Tier 3 Surface use agreement obtained for drilling multiple off-spacing wells from the MORRIS-MACHETE Pad.
๐Ÿ“„ Affidavit of Surface Damage Agreement
The affidavit confirms a critical path item (surface access) is resolved for four off-spacing wells, enabling pad development.
2026-11-18 General Oilfield Services
Tier 3 Operator requests waiver of backbuild order notification for offset operator Phoenix Energy, as they are the same company.
๐Ÿ“„ Backbuild Order Waiver Letter
A formal, pre-permit waiver request for intra-company drilling simplifies regulatory compliance for a multi-well pad.
2026-06-09 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Waste Management
The permit locks in 'Select Water Solutions, LLC' as the cuttings disposal vendor to a specific landfill address, creating a near-term hauling and disposal contract opportunity upon spud.
Directional Drilling/Surveying
The detailed directional plan from 'Taktikal Directional' and the requirement for certified surveys at specific frequencies indicate ongoing directional drilling and survey monitoring services are needed for the ~20,000 ft lateral.
Civil Construction & Earthwork
The pad plat details ~48,200 cu yds of earthwork, specific cut/fill slopes, and access road construction, indicating imminent grading and pad construction services.
Cementing & Completions
The approved plan specifies a wet shoe sub and a complex cementing program with specific slurry designs, indicating specialized cementing and completion tool services are required for the lateral liner.