โ† Back to Daily Permits

๐Ÿ›ข๏ธ MACHETE 14-23-26-35 4H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43501 ยท Generated 2026-11-20 05:01

API
3305310935
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Affidavit confirms surface use agreement obtained for off-spacing wells on MORRIS-MACHETE Pad, covering all four MACHETE wells.
๐Ÿ“„ Affidavit of Surface Damage Agreement
Secures surface access for a multi-well pad, de-risking the entire project and enabling pad development.
2026-11-18 General Oilfield Services
Tier 3 Operator filed for a backbuild order waiver, stating wells will enter Bakken system outside target spacing unit and that Phoenix Energy is the offset operator.
๐Ÿ“„ Letter from Phoenix Operating
Reveals intent to drill from an off-spacing surface location, requiring regulatory coordination and neighborly conduct assurances.
2026-06-09 Regulatory / Permitting
Tier 3 Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre unit, with south setback based on cemented production liner and ability to frac out shoe.
๐Ÿ“„ Permit Stipulations
Imposes specific, non-standard geometric constraints on well placement and completion design, requiring precise engineering.
Unknown Directional Drilling
Tier 3 Well must be drilled in conjunction with another well meeting a 1220' setback from east/west boundaries to justify spacing unit.
๐Ÿ“„ Permit Stipulations
Makes drilling of this well contingent on another specific well, indicating a coordinated, multi-well development plan.
Unknown General Oilfield Services
Tier 3 Drill cuttings disposal explicitly contracted to Select Water Solutions, LLC Special Waste Landfill at a specific address.
๐Ÿ“„ Proposed Drilling Plan
Pre-selects a waste disposal vendor, locking out competitors for this operational phase.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Well Planning
Conditional permit with specific setback and co-drilling requirements demands precise well placement and trajectory design, creating immediate need for advanced directional services.
Waste Management & Logistics
Contract with Select Water Solutions is declared, but logistics of closed-loop system and hauling to the specified landfill represent an active service requirement.
Pad Construction & Earthwork
Detailed pad layout and earthwork quantities from UELS indicate pad construction is in planning/execution phase, requiring civil contractors.