Operator requested and was granted a waiver from the three-day waiting period after permit approval.โฐ TIME-SENSITIVE ๐ AFFIDAVIT- REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD Demonstrates operator urgency to commence operations immediately upon permit approval. |
2026-11-03 | Regulatory / Permitting |
| Tier 3 |
Lateral will be cemented with a wet shoe with the ability to frac out the toe. ๐ DRILLING PLAN / Completion Program Specific cemented lateral completion design differs from typical uncemented liners. |
Unknown | Completions / Frac |
| Tier 3 |
Aquifer location triggers mandatory onsite inspection and closed mud system with impermeable liner. ๐ PERMIT INFORMATION / STIPULATIONS Imposes strict, non-standard environmental controls and requires inspector engagement before construction. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator submitted a sundry to waive open hole logs, relying on MWD and cased hole evaluation. ๐ DRILLING PLAN / Evaluation Program Non-standard data acquisition strategy reduces conventional wireline logging scope. |
Unknown | General Oilfield Services |
| Tier 3 |
Fracture stimulation is planned to be pumped down the 7" intermediate casing; a frac string will only be used if mechanical issues arise. ๐ DRILLING PLAN / Completion Program Non-standard frac design using intermediate casing as the primary treating string. |
Unknown | Completions / Frac |