| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on 150'/500' setbacks and cemented production liner with wet shoe for frac-out ๐ Page 1, NDIC Field Order Info Imposes specific, non-routine wellbore placement constraints and a prescribed completion design (wet shoe) to protect unit boundaries. |
Unknown | Directional Drilling |
| Tier 3 |
Operator requests waiver from 3-day waiting period for pad re-occupationโฐ TIME-SENSITIVE ๐ Affidavit letter following 'AERIAL MAP' Demonstrates operator urgency to commence operations immediately upon permit approval, bypassing standard waiting period. |
2026-11-03 | Regulatory / Permitting |
| Tier 3 |
Aquifer location triggers mandatory onsite inspection and closed mud system with impermeable liner ๐ Page 1, STIPULATIONS Imposes non-standard, site-specific environmental controls and requires direct inspector coordination, increasing pre-spud planning complexity. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator submits sundry to waive open hole logs ๐ Drilling Plan, Section 5: Evaluation Program Indicates a cost-saving design choice that forgoes standard open-hole logging, relying instead on MWD and cased-hole evaluation. |
Unknown | General Oilfield Services |