๐Ÿ›ข๏ธ Cottonwood 104-0522H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43506 ยท Generated 2026-11-24 04:58

API
3306105735
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on unitized Alger-Bakken Unit setbacks and a cemented production liner with wet shoe for toe frac-out.
๐Ÿ“„ PERMIT INFORMATION / STIPULATIONS
Specific unitized formation and a non-standard cemented liner/wet shoe completion design requiring NDIC approval for toe frac-out.
Unknown Completions / Frac
Tier 3 Integrated pad development plan (Ross 5 NWNE) with multiple future wells, detailed earthwork, and interim reclamation layout.โฐ TIME-SENSITIVE
๐Ÿ“„ Well location plats and engineering drawings
Comprehensive multi-well pad design with cut/fill calculations, reclamation phasing, and facility layouts, indicating a major, planned development campaign.
2026-07-08 General Oilfield Services
Tier 3 Waiver requests required for density/porosity and resistivity logs; cement evaluation and gamma ray logs mandated.
๐Ÿ“„ GEOLOGIC INFORMATION / PROPOSED LOGS
Selective logging program with waivers, deviating from a full suite, while mandating specific evaluation logs.
Unknown Regulatory / Permitting
Tier 3 Detailed, vendor-specific cement slurry designs (Halliburton products) specified for each casing string.
๐Ÿ“„ CASING & CEMENTING PROGRAM
Cementing program specifies exact Halliburton product names and slurry designs, indicating pre-selection or strong product preference.
Unknown General Oilfield Services
Tier 3 Plan to switch to OBM if pressures exceed 10.0 ppg, with specific BOP equipment and testing regimen detailed.
๐Ÿ“„ DRILLING FLUIDS PROGRAM and PRESSURE CONTROL EQUIPMENT
Contingency plan for oil-based mud and a detailed, rigorous BOP testing schedule beyond minimum standards.
Unknown Mud / Fluids
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspector Dylan Roach.
๐Ÿ“„ Conditions of Approval
Unusual requirement to contact a named inspector prior to location construction, indicating heightened regulatory oversight or site-specific conditions.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing Services
Detailed, vendor-specific cement designs are prescribed in the approved drilling plan, making Halliburton the immediate and primary candidate for this work upon well construction.
Civil Earthwork & Pad Construction
Pad design with 22,905 CY excavation and 12,400 CY embankment is finalized; construction must follow the KLJ-engineered plans, with work likely preceding the 2027 drilling date.
Directional Drilling / MWD Services
The plan specifies a detailed directional survey program using 'Superior MWD+IFR1+SAG+FI' or 'OWSG MWD + IFR1 + Sag + F' tools, indicating need for precise wellbore placement within the unitized target.
Hydraulic Fracturing
The well is designed for a multi-stage completion (79 proposed stages) with a specific toe-initiation technique, requiring frac planning and coordination, though no immediate vendor is named.