๐Ÿ›ข๏ธ Cottonwood 18-0522H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43507 ยท Generated 2026-11-24 04:59

API
3306105736
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on a 150' north/south and 500' east/west setback within the Alger-Bakken Unit, with north setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, first page
Imposes specific, non-standard geometric constraints and a completion technique (frac out the shoe) as a permit condition.
Unknown Completions / Frac
Tier 3 EOG must contact NDIC Field Inspector Dylan Roach prior to location construction, and a Sundry Notice must be filed within 3 business days of spudding.
๐Ÿ“„ Page 2, Conditions of Approval
Specifies a mandatory pre-construction contact with a named inspector and a tight post-spud reporting deadline.
Unknown General Oilfield Services
Tier 3 Operator requests permission to frac out the toe, with a toe assembly using a standard burst plug to initiate the fracture process.
๐Ÿ“„ Drilling Plan, 4 1/2" Production Liner & Cementing schematic notes
Explicitly declares an intent to use a specific, non-routine completion technique (burst plug and open shoe) requiring regulatory approval.
Unknown Completions / Frac
Tier 3 The Alger-Bakken Unit is defined from 50 feet above the top of the Bakken Formation to above the top of the Birdbear Formation, as identified on a specific log from a reference well.
๐Ÿ“„ Stipulations section, Conditions of Approval
Defines the unitized interval with extreme precision tied to a specific historical log, constraining target and off-target drilling.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
The approved directional plan with specific survey requirements and a long lateral (~16,000 ft) indicates imminent need for directional services and survey tools.
Cementing & Stimulation
The conditional permit requiring ability to 'frac out the shoe' and the detailed cementing programs with named products signal upcoming cementing and stimulation work.
Pad Construction & Civil Engineering
Detailed cut/fill volumes, grading plans, and a pre-construction inspector contact requirement indicate pad construction is a immediate next step.