| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval conditional on a 150' north/south and 500' east/west setback within the Alger-Bakken Unit, with north setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe. ๐ Stipulations section, first page Imposes specific, non-standard geometric constraints and a completion technique (frac out the shoe) as a permit condition. |
Unknown | Completions / Frac |
| Tier 3 |
EOG must contact NDIC Field Inspector Dylan Roach prior to location construction, and a Sundry Notice must be filed within 3 business days of spudding. ๐ Page 2, Conditions of Approval Specifies a mandatory pre-construction contact with a named inspector and a tight post-spud reporting deadline. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator requests permission to frac out the toe, with a toe assembly using a standard burst plug to initiate the fracture process. ๐ Drilling Plan, 4 1/2" Production Liner & Cementing schematic notes Explicitly declares an intent to use a specific, non-routine completion technique (burst plug and open shoe) requiring regulatory approval. |
Unknown | Completions / Frac |
| Tier 3 |
The Alger-Bakken Unit is defined from 50 feet above the top of the Bakken Formation to above the top of the Birdbear Formation, as identified on a specific log from a reference well. ๐ Stipulations section, Conditions of Approval Defines the unitized interval with extreme precision tied to a specific historical log, constraining target and off-target drilling. |
Unknown | General Oilfield Services |