| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
EOG requests permission to frac out the toe (wet shoe). ๐ Drilling Plan, Cementing Program notes Specific, non-standard completion technique requested for regulatory approval. |
Unknown | Completions / Frac |
| Tier 3 |
Permit condition requires contacting NDIC Field Inspector Dylan Roach prior to location construction. ๐ Page 2 of 10, Conditions of Approval Creates a mandatory pre-construction contact point, adding a regulatory coordination step. |
Unknown | General Oilfield Services |
| Tier 3 |
Permit condition requires a closed mud system with no cuttings pit. ๐ Page 1 of 10, Permit Review Policy Specifies a waste management method, eliminating a traditional pit. |
Unknown | Mud / Fluids |
| Tier 3 |
Permit condition requires a perimeter berm surrounding the entire location. ๐ Page 2 of 10, Conditions of Approval Non-standard environmental containment requirement beyond typical diking. |
Unknown | General Oilfield Services |
| Tier 3 |
Permit condition requires remote or automatic shutoff devices on all equipment. ๐ Page 1 of 10, Permit Review Policy Mandates a higher level of automation and safety control. |
Unknown | General Oilfield Services |