| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Request to frac out the toe of the production liner, which is cemented with a wet shoe. ๐ Drilling Plan / Cementing Notes Specific, non-routine completion technique requested (frac out shoe) for a cemented liner. |
Unknown | Completions / Frac |
| Tier 3 |
Approval conditional on 150' north/south and 500' east/west setbacks within Alger-Bakken Unit, with north setback based on cemented production liner and ability to frac out shoe. ๐ Permit Stipulations Imposes specific, non-standard wellbore placement constraints tied to unit boundaries and completion design. |
Unknown | Completions / Frac |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Dylan Roach prior to location construction.โฐ TIME-SENSITIVE ๐ Construction Commencement Notification Pre-construction inspection contact is a specific, named regulatory checkpoint. |
Relative | General Oilfield Services |