← Back to Daily Permits
COMPLETION
Completion: No contemporaneous documentation explaining the new permit was found in the provided well file. The file contains material related to the initial APD approval and subsequent operations, but no Form 4 or other documents referencing a new permit or justifying a permit action anchored to a recent appro
Aagvik 5298 41-35 3BX
Oasis Petroleum North America LLC · McKenzie County, ND · File #34037 · Generated 2026-10-14 06:31
- API
- 33-053-08196
- Target Formation
- Middle Bakken
- Permit Explained
- No
Permit Cycle Assessment
No contemporaneous documentation explaining the new permit was found in the provided well file. The file contains material related to the initial APD approval and subsequent operations, but no Form 4 or other documents referencing a new permit or justifying a permit action anchored to a recent approval date are present.
Permit Cycle Signals (0)
No permit cycle signals identified.
Historical Context (3)
Regulatory waiver granted for tubing/packer requirement during completion phase following fracture stimulation, citing specific casing specifications and safety assurances.
Sundry Notice dated July 27, 2018 · 2018-07-27
The variance from NDAC 43-02-03-21 establishes a precedent and specific operational constraints for future completion work on this well that may affect workover or re-stimulation planning.
Geosteering and anticollision plan required to underpass existing well Aagvik 1-35H with ~7' TVD clearance and bypass Lundeen 4-26H.
Sunburst Consulting Geology Report · 2018-04-18 | Relative
Defines permanent spatial constraints for any future lateral drilling, re-entries, or sidetracks from this wellbore to avoid well collisions.
Permit stipulation requiring closed mud system, no drilling pit, and impermeable liner due to well location on an aquifer.
Permit Stipulation Letter dated September 25, 2017 · 2017-09-25
Imposes permanent environmental and operational controls for all future drilling, completion, or workover activity on this location.
Operator Pattern
Proactive pursuit of regulatory waivers for standard operational requirements (open-hole logs, tubing/packer rules).
Sundry Notices requesting logging waiver (Sept 2017) and tubing/packer variance (July 2018) with technical justifications.
Confidence: High
The well file is extensive and contains clear regulatory correspondence, operational reports, and permit documents. The lack of any mention of a new permit action in the provided text is definitive.