COMPLETION
Completion: The permit action (UIC Permit Renewal UICSWD1142 effective 2025-08-27) is fully explained by contemporaneous documents: a Sundry Notice requesting renewal, an AOR map showing no new wells, proof of landowner notifications, and explicit regulatory approval citing those submissions. The operator chang
🛢️ Gathman SWD 1
Devon Energy Williston, LLC · Williams County, ND · File #39036 · Generated 2026-08-28 04:09
- API
- 3310505787
- Target Formation
- Dakota / Inyan Kara
- Permit Explained
- Yes
📋 Permit Cycle Assessment
The permit action (UIC Permit Renewal UICSWD1142 effective 2025-08-27) is fully explained by contemporaneous documents: a Sundry Notice requesting renewal, an AOR map showing no new wells, proof of landowner notifications, and explicit regulatory approval citing those submissions. The operator change (Grayson Mill to Devon) is documented via Form 15 and is a separate but necessary regulatory action for the permit to be effective under the new operator.
🔍 Permit Cycle Signals (5)
📄 Form 15 Notice of Transfer, first page
📅 2024-12-10 (Exact confidence)
This is a direct regulatory action required for the new operator to assume liability and regulatory compliance for the well.
📄 Sundry Form dated October 31, 2025 (first Form 4)
📅 2025-08-27 (Exact confidence)
Explicit permit renewal approval with an effective date, directly tied to the operator's renewal request and landowner notification requirement.
📄 Notice of Saltwater Disposal Permit Renewal letters and certified mail receipts (May-July 2025 section)
📅 2025-05-18 to 2025-07-12 (Exact confidence)
Mandatory UIC public notice and proof of service condition for permit renewal approval.
📄 Sundry Form dated October 31, 2025, 'Reviewer Comments' section
📅 2025-08-27 (Exact confidence)
Direct regulator approval with named individual and date, confirming compliance with renewal criteria.
📄 Sundry Form 'DESCRIPTION (OPERATOR)' sections (2024 and 2025)
📅 2024-05-23 to 2025-08-12 (Exact confidence)
Financial condition precedent for permit processing and renewal.
📖 Historical Context (4)
Original UIC Permit (Order No. 31750, Case No. 29183) authorized SWD into Dakota Group/Inyan Kara Formation with Maximum Allowable Injection Pressure of 1677 psi, fracture gradient 0.8 psi/ft, and specific construction/stipulation requirements (e.g., perimeter berm, pressure testing, cementing).
📄 Order No. 31750 and UIC permit details (June 20, 2022 permit pages) · 📅 2022-06-20
The original permit's technical parameters (injection pressure, zone, construction specs) and stipulations (berm, pressure test reporting) remain in force for all subsequent renewals and govern ongoing operations.
Tank diking variance approved contingent on submission of as-built site schematic after construction; Sundry Notice required within 30 days of construction completion detailing facility schematic.
📄 UIC permit stipulations, page 2 of 10 (June 20, 2022) · 📅 2022-06-20
This is a standing regulatory condition requiring ongoing compliance documentation for facility modifications and may affect future construction or modification approvals.
Requirement to contact NDIC Field Inspector Jessica Gilkey prior to location construction and to notify NDIC immediately upon spudding.
📄 UIC permit stipulations, page 1 and 2 of 10 (June 20, 2022) · 📅 2022-06-20
These are pre-construction and spud notification obligations that persist for any future work (e.g., workovers, re-entries) requiring location disturbance or drilling activity.
Baseline freshwater well sampling within 1-mile AOR conducted in 2021 (SGS Report DA37764) showing no contamination, with affidavit confirming search and sampling.
📄 Water sample analysis report and affidavit (November 2021) · 📅 2021-09-23 to 2021-11-03
Establishes baseline groundwater quality for ongoing UIC integrity monitoring and is a prerequisite for initial permit issuance that remains part of the well's regulatory record.
🔧 Operator Pattern
Operator has consistently pursued annual UIC permit renewals with timely landowner notifications and AOR reviews, demonstrating regulatory compliance focus. The 2025 transfer to Devon Energy reflects corporate asset transaction.
Renewal applications in 2023, 2024, and 2025 follow identical template; 2025 renewal processed under new operator post-acquisition. No non-compliance flags noted in reviewer comments.
Confidence: High
The provided well file contains a complete UIC permit renewal application, including a Form 4 Sundry notice with operator description, AOR map, and regulator review and approval. The document includes explicit approval conditions and stipulations tied directly to the permit renewal.