← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
First detected 2026-11-19 · was Oct 28, 2026 · +2 pages · Full diff →

Avalanche 161-93-16-4-3TFHX

Silver Hill Energy Operating, LLC · Burke County, ND · File #NDIC File 40420 / Commission Order No. 35522 · Generated 2026-11-27 02:13

API
3301301935
Target Formation
Three Forks Fm. (1st Bench)
Permit Explained
Yes

Permit Cycle Assessment

The file contains contemporaneous documentation for the 2026 permit cycle. The permit modification approval dated 2026-10-21 is supported by an operator submission dated 2026-10-19 that documents revised wellbore and completion geometry, by pre-permit drill-back and surface-use documentation, and by an NDIC geologist-approved open-hole log waiver dated 2026-10-23. No separate approval memorandum explains the regulator's decision, but the permit stipulation, operator justification, and waiver documentation together explain and condition the permit action.

Permit Cycle Signals (5)

NDIC approved an open-hole log waiver under Rule 43-02-03-31 based on offsetting open-hole logs from LFM 1 22-34 161-93 BTF, NDIC File #38114, within one mile, while still requiring GR-CBL, CBL, and mud log submissions.
Direct
Sundry Form ID 344369, Reviewer Comments / Status
2026-10-23 (Exact confidence)
It directly resolves the density/porosity and resistivity log waivers requested in the permit application and modifies the normal logging obligation for this permit cycle.
Commission Order No. 35522 conditions the permit's north setback on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Permit Information, Stipulations page 2, File 40420, Order 35522
2026-10-21 (Exact confidence)
The approval explicitly ties the setback condition to a non-routine liner/wet-shoe completion geometry rather than routine horizontal-drilling boilerplate.
The operator submission dated 2026-10-19 shortens the casing point, total depth, and completion interval; revises KOP coordinates; removes the second production casing in favor of a single-stage production liner; and updates the legal coordinates used in the permit.
Supporting
Proposed Work / Changes to APD and Submitted By page, File 40420
2026-10-19 (Exact confidence)
It documents the revised wellbore and completion plan that the 2026-10-21 permit modification replaces.
Silver Hill submitted a drill-back offset-operator notification for drill-back into adjacent spacing unit 161-93-21, providing directional/completion plan information and referencing NDIC Order No. 31973 Case #29449.
Supporting
Drill-Back Offset Operator Notification letter, September 17, 2026
2026-09-17 (Exact confidence)
It supports approval of the revised wellbore path by addressing the adjacent-unit drill-back condition required for this permit cycle.
An executed Surface Use and Damage Agreement affidavit was supplied for off-unit drilling from the Section 15 pad.
Supporting
Affidavit of Surface Use and Damage Agreement, September 16, 2026
2026-09-16 (Exact confidence)
It satisfies the off-spacing surface-agreement condition associated with the permit application and supports approval for the revised pad geometry.

Historical Context (3)

Operator responsibility transferred from Liberty Resources Management Company, LLC to Silver Hill Energy Operating, LLC under Form 15, with the transfer confirmed by an August 21, 2024 NDIC letter and bond number B015331.
Form 15 Notice of Transfer of Oil and Gas Wells and NDIC transfer confirmation letter · 2024-08-21
Future NDIC obligations, fees, notifications, and bonding liability run to Silver Hill rather than Liberty, affecting how all post-transfer operations must be administered.
The operator states that completion plans must protect listed Bakken/Three Forks offsetting wellbores and that offset operators within 2,640 feet will receive written frac notice at least 21 days and no more than 31 days before stimulation.
STATEMENT - Completion Plans - Avoidance of Offsetting Wells, September 16, 2026 · 2026-09-16
The obligation persists after drilling permit approval and directly constrains future hydraulic-fracture scheduling and well-integrity protection.
The approved permit cycle states that any change to casing point, total depth, or completion technique within the Bakken-Three Forks Petroleum System requires prior NDIC approval.
Operator Statements / Operator Assertions page, File 40420 · 2026-10-21
It constrains future drilling or completion deviations and prevents the operator from changing the approved Bakken-Three Forks geometry without a new regulatory action.

Operator Pattern

Silver Hill inherited a Liberty-era multi-well pad and has maintained the project through permit renewals, then reconfigured the well with a shorter casing point and liner-based completion plan while seeking logging relief and regulatory notifications for adjacent-unit/off-spacing work.
Form 15 transfer and bond confirmation; permit renewals effective 2025-01-15 and 2026-01-02; 2026-10-21 permit modification under Order 35522; 2026-10-23 open-hole log waiver; September 2026 drill-back notification and surface-use affidavit.
Confidence: High
The most recent permit modification and related open-hole log waiver are explicitly dated and identified. Supporting operator submissions and regulatory notifications are also dated. OCR inconsistencies such as file-number and county variants were not relied upon.