OTHER
Wellfile updated - +18 pages
First detected 2026-11-02 · was Sep 1, 2026 · +18 pages · Full diff →

Jefferson Federal 5003 42-14 8B

WHITING OIL AND GAS CORPORATION · McKenzie County, ND · File #41438 · Generated 2026-11-27 02:13

API
3305310464
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit for suspension of drilling is directly explained by the operator's request and the regulator's conditioned approval for a split-rig operation. The contemporaneous sundry notice details the justification and the specific regulatory requirements.

Permit Cycle Signals (3)

Approval for suspension of drilling for up to 90 days to use a smaller rig for surface hole and surface casing, followed by a larger rig for TD.
Direct
Sundry Form for Well File No.: 41438 FORM ID: 324237 (Request for Consideration/Waiver - Suspension of Drilling)
2026-07-14 (Exact confidence)
Regulator granted a non-routine operational waiver allowing a split-rig approach with specific reporting requirements.
Regulator imposed conditions: immediate call after spudding and plug bump, call inspector when conventional rig returns, no intentional deviation in surface hole, monthly conventional rig updates.
Direct
Sundry Form for Well File No.: 41438 FORM ID: 324237 (Reviewer comments)
2026-07-14 (Exact confidence)
Direct regulatory stipulations conditioning the suspension of drilling approval.
Permit renewal approved with all original stipulations and conditions applying.
Supporting
Sundry Form for Well File No.: 41438 FORM ID: 291288 (Permit Renewal)
2026-01-07 (Exact confidence)
Extends the validity of the original permit (including its conditions) which is prerequisite for the suspension of drilling operation.

Historical Context (4)

Open hole log waiver approved based on offset well data within a mile, with requirement to run GR-CBL from TD to ground level.
Sundry Form for Well File No.: 41438 FORM ID: 248453 (Open Hole Log Waiver) · 2025-05-20
Defines the well evaluation program; GR-CBL must be run and submitted, affecting logging operations and data submission.
State Geologist requirement for core and sample collection and submission from Base of Last Charles Salt, with specific intervals and shipping deadlines.
Cores and Samples letter from Ross Edison, Geologist · 2024-12-30
Imposes a persistent sample collection and curation obligation that must be fulfilled within 30/180 days of drilling completion.
Permit stipulation based on Order 32449: 150' setback from N/S boundaries and 500' setback from E/W boundaries within the 1920-acre spacing unit.
Permit Information Stipulations section · 2024-12-18
Legally constrains wellbore placement within the spacing unit for the life of the well; defines the south setback based on a cemented liner with wet shoe.
Requirement to contact NDIC Field Inspector prior to location construction and to notify upon spudding.
Permit Information Stipulations section (Construction Commencement Notification) · 2024-12-18
Ongoing notification protocol required before and during drilling operations.

Operator Pattern

Utilizes pad drilling with detailed anti-collision planning and standard wet shoe completion design.
Multiple wells on Jefferson Federal Pad; anticollision report references offset wells on same pad; drilling workbook describes standard wet shoe configuration.
Confidence: High
Key permit-cycle documents (suspension request and approval) are clearly dated and contain explicit regulatory conditions. Historical context is well-segregated into dated stipulations and requirements.