NO COMPARISON
Well file changed - no earlier copy to compare
First detected 2026-10-29 · Full diff →

CRYING TREE 147-97-8-5-5H

ENERPLUS RESOURCES USA CORPORATION · Dunn County, ND · File #41472 · Generated 2026-11-27 02:13

API
3302505025
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is conditioned upon specific setbacks tied to cementing procedures and requires NDIC notification before construction activities. Standard operating procedures are specified for commencement of operations, and specific logging operations may be waived upon request.

Permit Cycle Signals (4)

Pursuant to Commission Order No. 34729, approval to drill the well is hereby given. The approval is granted on the condition that all portions of the well bore not isolated by cement, be no closer than the 150' setback from the north & south boundaries and 500' setback from the east & west boundaries within the 1280-acre spacing unit consisting of Sections 5 and 8, Township 147 North, Range 97 West.
Direct
Permit Information
2025-09-26 (Exact confidence)
Sets specific setback requirements based on spacing unit and wellbore cement isolation, conditioning permit approval.
The north setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Supporting
Permit Information
2025-09-26 (Exact confidence)
Explains the rationale for the north setback condition related to the cementing and completion technique.
Enerplus must contact NDIC Field Inspector Doug Dolyniuk at 701-590-5317 prior to setting conductor or expanding the pad.
Direct
Permit Information
2025-09-26 (Exact confidence)
Mandates contact with the NDIC field inspector before specific construction activities.
Operators shall not commence operations on a drill site until the 3rd business day following publication of the approved drilling permit on the NDIC - OGD Daily Activity Report. If circumstances require operations to commence before the 3rd business day following publication on the Daily Activity Report, the waiting period may be waived by the Director.
Direct
Permit Information
2025-09-26 (Exact confidence)
Specifies a waiting period before drilling operations can begin, unless a waiver is granted.

Historical Context (1)

Effective June 1, 2014, a container must be maintained on each well drilled in North Dakota beginning when the well is spud and must remain on-site during clean-out, completion, and flow-back whenever filtration operations are conducted.
Letter regarding Filter socks and other filter media · 2025-05-30
This requirement for a leak-proof container for filter sock disposal persists throughout the well's lifecycle during specific operations.
Confidence: High
Multiple direct references to stipulations and conditions of approval.