← Back to Daily Permits
NO COMPARISON
Well file changed - no earlier copy to compare
First detected 2026-10-29 · Full diff →

CRYING TREE 147-97-8-5-7H

ENERPLUS RESOURCES USA CORPORATION · Dunn County, ND · File #41474 · Generated 2026-11-27 02:13

API
3302505027
Target Formation
Middle Bakken
Permit Explained
Partially

Permit Cycle Assessment

The well file contains documentation justifying changes to the wellbore depths, direction, BHL, completion method, and sampling program. Sundry notices outline these modifications and a drilling suspension. This explains the approved changes to the original drilling plan.

Permit Cycle Signals (5)

The wellbore depths, direction, and BHL have changed slightly from original permit.
Direct
SUNDRY FORM FOR WELL FILE NO.: 41474
2025-11-17 (Exact confidence)
Justifies changes from the original permit.
Enerplus is also requesting to change the completion method of this well from fully cemented with no ability to frac out to wet shoe with the ability to frac out.
Direct
SUNDRY FORM FOR WELL FILE NO.: 41474
2025-11-17 (Exact confidence)
Justifies change in completion method.
New toe design requires a 150' setback at the toe. Max legal coordinate: 9446' North maximum
Direct
SUNDRY FORM FOR WELL FILE NO.: 41474
2025-11-17 (Exact confidence)
Justifies the 150' setback at the toe.
Enerplus would like to request a waiver for the collection of samples in the vertical portion of the above mentioned well.
Supporting
WELL SUNDRY FORM
2025-11-04 (Exact confidence)
Waiver request justifies altered sampling program.
Operator requests permission for suspension of drilling for up to 90 days for the referenced well under NDAC 43-02-03-55.
Supporting
SUNDRY FORM FOR WELL FILE NO.: 41474
2025-11-03 (Exact confidence)
Justifies temporary suspension of drilling operations.

Historical Context (3)

All cores, core chips and samples must be submitted to the State Geologist as provided for under North Dakota Century Code: Section 38-08-04 and North Dakota Administrative Code: Section 43-02-03-38.1.
RE: CORES AND SAMPLES · 2025-01-06
Ongoing obligation for core/sample submission, enforced by potential penalties.
The approval is granted on the condition that all portions of the well bore not isolated by cement be no closer than the 150' setback from the south boundary, 50' setback from the north boundary, and 500' setback from the east & west boundaries within the 1280-acre spacing unit consisting of Sections 5 and 8, Township 147 North, Range 97 West.
STIPULATIONS · 2025-01-02
This condition constrains future wellbore positioning.
A covered leak-proof container (with placard) for filter sock disposal must be maintained on the well site beginning when the well is spud, and must remain on-site during clean-out completion, and flow-back whenever filtration operations are conducted.
Page: 10 of 10 Date: 1/2/2025 · 2025-01-02
Ongoing waste management requirement.
Confidence: High
Multiple documents explain key permit conditions and stipulations.