COMPLETION
Completion: The permit is justified by a tubing/packer waiver, remote stimulation approval, and specific setback requirements.
Updated 2026-07-15 · was Jun 3, 2026 · +13 pages · Full diff →

🛢️ Willey 6-3H

CONTINENTAL RESOURCES, INC. · Williams County, ND · File #41776 · Generated 2026-07-15 06:25

API
33-105-06499
Target Formation
Middle Bakken
Permit Explained
Yes

📋 Permit Cycle Assessment

The permit is justified by a tubing/packer waiver, remote stimulation approval, and specific setback requirements.

🔍 Permit Cycle Signals (3)

Waiver from tubing/packer requirement during completion period post-fracture stimulation
Direct
📄 SUNDRY FORM FOR WELL FILE NO.: 41776
📅 2025-09-24 (Exact confidence)
Waiver modifies standard completion requirements based on casing burst rating and frac design safety factor
Approval for remote stimulation of Rose Federal 4-34H using temporary casing string
Direct
📄 SUNDRY FORM FOR WELL FILE NO.: 41776
📅 2025-10-07 (Exact confidence)
Non-standard stimulation method requiring pressure testing and landowner agreements
150' setback from north/south boundaries and 500' setback from east/west boundaries within spacing unit
Direct
📄 PERMIT INFORMATION
📅 2025-04-04 (Exact confidence)
Specific setback requirements tied to cemented production liner and wet shoe frac capability

📖 Historical Context (2)

Drill cuttings sample waiver for vertical portion (Lower Charles Salt to KOP)
📄 SUNDRY FORM FOR WELL FILE NO.: 41776 · 📅 2025-04-30
Sets precedent for sample collection protocols on pad wells
90-day suspension of drilling authorization after surface casing set
📄 SUNDRY FORM FOR WELL FILE NO.: 41776 · 📅 2025-05-01
Establishes operational timeline constraints for pad development
Confidence: High
Direct regulatory correspondence and approved waivers provide clear permit justification