← Back to Daily Permits
NO COMPARISON
Well file changed - no earlier copy to compare
GO-ZONA-157-98-3523H-2
Hess Bakken Investments II, LLC · Williams County, ND · File #41778 · Generated 2026-11-27 02:13
- API
- 3310506501
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is explained by contemporaneous regulatory actions, including an open hole log waiver, a suspension of drilling approval, specific setback conditions tied to completion design, and a pre-construction notification requirement. Supporting submissions justify cross-unit drilling and anti-collision planning.
Permit Cycle Signals (5)
Sundry Form ID 240758 (Open Hole Log Waiver)
2025-04-08 (Exact confidence)
Waiver eliminates routine logging requirement, conditioning permit approval on alternative data source.
Sundry Form ID 240753 (Suspension of Drilling)
2025-04-08 (Exact confidence)
Regulatory approval for a non-standard drilling sequence, conditioning the permit on a specific operational timeline and procedure.
Permit Stipulations (NDIC Field Order Info, Bakken Setback Summary Statement)
2025-04-07 (Exact confidence)
Specific geometry constraint tied to a non-routine completion design (cemented liner with wet shoe) differentiates from standard setbacks.
Permit Stipulations (Construction Commencement Notification)
2025-04-07 (Exact confidence)
Direct regulator-imposed pre-construction condition.
Letter from John DeWitt Jr. dated 2025-02-04
2025-02-04 (Exact confidence)
Justifies permit approval for wells with planned drill-backs outside the target spacing unit by addressing cross-unit regulatory requirements.
Historical Context (2)
Cement stabilization of the pad completed on 2025-06-25, with a reclamation plan requiring future milling, sampling, and potential soil amendment to match pre-stabilization conditions.
Sundry Form ID 280393 (Notification of Work Performed - Location Stabilization) · 2025-06-25
Creates a forward obligation for final pad reclamation, requiring specific testing and remediation steps that affect site closure.
Affidavit confirming hydraulic fracturing treatments will not use specified diesel fuels, covering all Hess wells in the Bakken project.
Letter from Tom Richardson dated 2022-04-21 · 2022-04-21
Establishes a binding operational constraint on completion fluid chemistry for all subsequent wells, including this one.
Operator Pattern
Systematic use of regulatory waivers (log, SOD) and pad stabilization to optimize operations.
Multiple Sundry Forms (240758, 240753, 280393) show repeated requests for operational flexibility within regulatory frameworks.
Confidence: High
Clear, dated regulatory correspondence (Sundry approvals, letters) and permit stipulations directly tied to the permit approval date of 2025-04-07. Key signals have exact dates and explicit regulatory roles.