Permit Cycle Assessment
The well file contains documentation explaining and justifying the permit approval, including stipulations related to setbacks, aquifer protection, and a waiver for open hole logs and the 3-day waiting period. Setbacks are tied to production liner cementing.
Permit Cycle Signals (4)
WELL SUNDRY FORM
2025-11-12 (Exact confidence)
Justifies waiving open hole logs, indicates cement bond log will be run.
PERMIT INFORMATION
2025-06-02 (Exact confidence)
Specifies required features of the closed mud system due to the presence of the aquifer.
PERMIT INFORMATION
2025-06-02 (Exact confidence)
Details specific setback requirements and explicitly ties the south setback to cementing of the production liner.
PERMIT INFORMATION
2025-06-02 (Exact confidence)
Approves a waiver to allow operations before the standard 3-day waiting period.
Historical Context (2)
Cuttings will be stored in large volume metal containers and hauled to an offsite commercial facility. Dikes, as well as the base material under the dikes and within the diked area, will be constructed of sufficiently impermeable material to provide emergency containment. Indirect heater to be utilized.
PERMIT INFORMATION · 2025-06-02
Dictates specific handling/disposal requirements that persist during operational phase.
Effective June 1, 2014, a covered leak-proof container (with placard) for filter sock disposal must be maintained on the well site beginning when the well is spud and must remain on-site during clean-out, completion, and flow-back whenever filtration operations are conducted?
PERMIT INFORMATION · 2025-06-02
Ongoing requirement for waste management best practices.