The permit renewal is explained by a single operator request that explicitly states all stipulations and conditions from the original 2025 permit apply. The renewal relies on the original permit's justification, which included non-routine anticollision analysis, a geologist's core/sample order, and
Erie Federal 41-3 3-10 TF4H
TRUE OIL LLC · McKenzie County, ND · File #42000 · Generated 2026-10-14 06:31
- API
- 3305310601
- Target Formation
- Three Forks First Bench (B1)
- Permit Explained
- Yes
Permit Cycle Assessment
The permit renewal is explained by a single operator request that explicitly states all stipulations and conditions from the original 2025 permit apply. The renewal relies on the original permit's justification, which included non-routine anticollision analysis, a geologist's core/sample order, and operator compliance statements.
Permit Cycle Signals (4)
Sundry Form for Well File No.: 42000 - DESCRIPTION (OPERATOR) and REVIEWER COMMENTS
2026-05-29 (Exact confidence)
This is the sole justification for the renewal permit. It explicitly ties the new approval to the conditions of the original permit dated 2025-06-12.
Anticollision Report summary and sections (e.g., 2,241.40 ft MD)
2025-01-27 (Exact confidence)
The original permit's geometry and approval were directly conditioned on this anticollision analysis, which justifies the well path and is a non-routine technical submission.
Letter from Ross Edison (Geologist), North Dakota Geological Survey
2025-06-16 (Exact confidence)
This is a regulator-issued, non-standard stipulation directly tied to the original permit. It conditions the approval on specific geologic data collection.
Letter from Sergio Villa (True Oil) to Daniel Kuchar (NDIC)
2025-06-04 (Exact confidence)
This is a supporting technical submission that justifies compliance with a routine condition (closed mud system) for the original permit.
Historical Context (3)
Specific, non-standard setback distances (150' north, 50' south, 500' east/west) defined by Commission Order 29253, with the south setback based on a production liner cemented in the lateral.
Permit Stipulations section (Page 2 of 10), 'Bakken Setback Summary Statement' · 2025-06-12
These setbacks are legally binding geometric constraints that govern the placement of the wellbore and persist for the life of the well, affecting any future re-drills, sidetracks, or plugging operations.
Requirement to contact NDIC Field Inspector Will Ryan prior to location construction.
Permit Stipulations section (Page 2 of 10), 'Construction Commencement Notification' · 2025-06-12
This is a persistent, well-specific operational constraint tied to a specific inspector. It remains a pre-spud obligation for any future drilling/completion activity on this well.
Stipulation that any changes to casing point, TD, or completion technique within the Bakken-Three Forks system require prior NDIC approval.
Permit Operator Assertions (Page 10 of 10) · 2025-06-12
This is a standing regulatory control over major wellbore modifications, creating a lasting obligation for the operator throughout the well's lifecycle.
Operator Pattern
Operator uses detailed directional planning, anticollision analysis, and comprehensive H2S safety plans for multi-well pads on federal (National Forest) lands.
Anticollision report includes multiple wells on the same pad; Detailed H2S Drilling Operations Plan; Pad layout shows integration with existing wells (True Federal 21-3 3-10H, Erie Federal 11-3 3-10 TF1H, Erie Federal 31-3 3-10 TF3H).
Confidence: High
The permit renewal explanation is explicit and contained in a single document. The original permit date and its conditions are clearly stated. Key non-routine stipulations (setbacks, inspector contact, core requirements) are directly quoted from the permit document. Anticollision report date and content are provided. No dates were invented.