PAULSON 5104 44-13 3B

WHITING OIL AND GAS CORPORATION · McKenzie County, ND · File #42226 · Generated 2026-11-27 02:13

API
3305310677
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit file contains several items that justify the approval, including stipulations related to spacing, setbacks, pre-construction notifications, BLM involvement, and a waiver for open hole logs.

Permit Cycle Signals (5)

Pursuant to Commission Order No. 34230, approval to drill the well is hereby given. The approval is granted on the condition that all portions of the well bore not isolated by cement be no closer than the 500' setback from the north and south boundaries and 150' setback from the east & west boundaries within the 1920-acre spacing unit consisting of Sections 13, 14, and 15, Township 151 North, Range 104 West.
Direct
Permit Information Stipulations section
2025-08-18 (Exact confidence)
Specifies spacing unit and setback requirements conditional to permit approval, referencing Order 34230.
The west setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Supporting
Permit Information Stipulations section
2025-08-18 (Exact confidence)
Justifies the western setback based on well completion design.
Whiting must contact NDIC Field Inspector Will Ryan at 701-770-6684 prior to location construction.
Direct
Permit Information Stipulations section
2025-08-18 (Exact confidence)
Requires pre-construction contact with NDIC Field Inspector, conditioning approval.
Operator is requesting to waive the requirement for open hole logs on the subject well, under NDIC Rule 43-02-03-31 concerning well logging operations. The offsetting well%3B PAULSON 13-14H (NDIC# 21594) is on the same pad and therefore within a mile of the proposed PAULSON 5104 44-13 3B, and will have open logs run on it sufficient to establish formation tops for the well. There will be a GR-CBL ran from TD to ground level.
Supporting
Sundry Form for Well File No. 42226 Description (Operator) section
2025-08-19 (Exact confidence)
The operator requested and received a waiver for open hole logs, conditional to running GR-CBL logs.
It appears that the below captioned permit applications are within a spacing unit that may be subject to a Federal permit. Please contact the BLM office in Dickinson at (701) 227-7713 to ensure that all documentation has been properly filed.
Direct
Email from Doug Jackson
2025-08-15 (Exact confidence)
The NDIC flagged this well for possible BLM involvement

Historical Context (2)

North Dakota Century Code Section 38-08-04 provides for the preservation of cores and samples and their shipment to the State Geologist when requested. The following is required on the above referenced well: All cores, core chips and samples must be submitted to the State Geologist as provided for under North Dakota Century Code: Section 38-08-04 and North Dakota Administrative Code: Section 43-02-03-38.1.
Letter from Ross Edison, Geologist · 2025-08-25
Sets ongoing requirements for core and sample submission that persist beyond the permit approval date.
Effective June 1, 2014, a container must be maintained on each well drilled in North Dakota beginning when the well is spud and must remain on-site during clean-out, completion, and flow-back whenever filtration operations are conducted. The on-site container must be used to store filters until they can be properly disposed of in an authorized facility...
Letter from Assistant Director, Dakota Mineral Resources regarding Filter Socks and Other Filter Media · 2025-05-30
Establishes a standing protocol for filter sock disposal that applies to this and future wells.

Operator Pattern

Whiting/Chord provides notification to adjacent operators regarding drill-back policy.
Affidavits affirm notifications to Zavanna LLC and Murex Petroleum Corporation regarding drill-back policy.
Confidence: High
Key stipulations and requirements are clearly documented and dated.