← Back to Daily Permits
OTHER
Wellfile updated - +7 pages
First detected 2026-11-23 · was Nov 13, 2026 · +7 pages · Full diff →

PAULSON 5104 44-13 4B

Whiting Oil & Gas Corporation · McKenzie County, ND · File #42227 · Generated 2026-11-27 02:13

API
3305310678
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly justified by specific setback conditions a logging waiver requestৎ and casing integrity verification requirements.

Permit Cycle Signals (3)

Approval granted on condition that all portions of the wellbore not isolated by cement be no closer than the 1220' setback (per Commission policy) from the north and south boundaries and 150' setback from the east & west boundaries within the 1920-acre spacing unit
Direct
Permit Information - Stipulations
2025-08-18 (Exact confidence)
Specific setback requirements conditioned on permit approval
Operator is requesting to waive the requirement for open hole logs on the subject well, under NDIC Rule 43-02-03-31 concerning well logging operations
Direct
Well Sundry Form - Request for Consideration/Waiver
2025-08-19 (Exact confidence)
Waiver request for open hole logs justifies permit conditions
Must run a CBL on 9-5/8" Dakota string prior to running 7" production string
Direct
Permit Information - Stipulations
2025-08-18 (Exact confidence)
Technical requirement conditioning permit approval

Historical Context (2)

Operator has evaluated the subject wells for anti-collision concerns by taking precautions including real-time corrected surveys and maintaining an industry-standard 1.2 separation safety factor
Anti-Collisionselves · 2025-06-25
Ongoing obligation to maintain anti-collision standards during drilling and future operations
Operator acknowledges they will contact the NDIC Field Inspector to seek proper plug-back procedures in the event of a sidetrack
Permit Information - Stipulations · 2025-08-18
Creates ongoing regulatory obligation for sidetrack operations
Confidence: High
Permit-cycle signals are directly tied to approval documents with precise dates