WEST SHELL 1-9-4H
IRON OIL OPERATING, LLC · Mountrail County, ND · File #42253 · Generated 2026-11-27 02:13
- API
- 3306105570
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval (suspension of drilling effective 2026-08-14) is directly explained by the operator's request for staged drilling using two rigs and the regulator's conditional approval with specific notification requirements.
Permit Cycle Signals (3)
Sundry Form (Request for Consideration/Waiver) - Type of Work: Suspension of Drilling
2026-08-14 (Exact confidence)
Permit action is a temporary suspension waiver allowing staged drilling with two rigs, conditioning approval on specific timelines and procedures.
Sundry Form Reviewer Comments section
2026-08-14 (Exact confidence)
Direct conditions attached to the suspension approval, creating specific reporting obligations tied to the staged drilling plan.
Sundry Form DESCRIPTION (OPERATOR) section
2026-08-10 (Exact confidence)
Operator-submitted justification and contingency plan that supports the regulatory waiver request for staged drilling.
Historical Context (3)
Core and sample collection requirement from Base of Last Charles Salt onward, with specific sampling intervals and submission deadlines.
Cores and Samples letter from State Geologist · 2025-09-02
Mandatory geological sample collection and submission obligation persists through drilling completion and affects post-drilling reporting timeline.
Wet Shoe Sub completion design with inability to frac out the shoe, requiring bridge plug at toe.
Well Construction Diagram and associated notes · Unknown
Completion design constraint affects fracture stimulation operations and requires specific plugging procedures.
Permit setback conditions based on cemented lateral with wet shoe and no ability to frac out the shoe.
Permit Stipulations section - Bakken Setback Summary Statement · 2025-08-26
Well-specific geometry (cemented lateral with wet shoe) establishes permanent boundary setbacks that constrain completion operations.
Operator Pattern
Utilizes staged drilling approach with smaller rig for surface hole to achieve cost and time savings.
Explicitly stated in suspension request: 'to take advantage of the cost savings and time savings of using an initial rig that is smaller than the rig necessary to drill a well to total depth.'
Confidence: High
Contemporaneous sundry notice directly requests and explains the permit action with specific dates, regulatory citations, and operator commitments. Regulator comments provide clear conditions of approval.