TECHNICAL
Technical update: The permit approval is directly conditioned by regulatory stipulations tied to Commission Order 34020, specific setback requirements justified by a cemented liner with a wet shoe design, a drilling/completion sequencing mandate, and jurisdiction-based pre-construction inspections.
AB-Kelly Renee Federal 29-26H MB LS
MUREX PETROLEUM CORPORATION · Williams County, ND · File #42455 · Generated 2026-10-14 06:31
- API
- 3310506738
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly conditioned by regulatory stipulations tied to Commission Order 34020, specific setback requirements justified by a cemented liner with a wet shoe design, a drilling/completion sequencing mandate, and jurisdiction-based pre-construction inspections.
Permit Cycle Signals (5)
Permit Information / Stipulations, Conditions of Approval
2026-06-15 (Exact confidence)
Stipulation directly conditions the permit approval on a non-standard setback linked to a specific well design (cemented liner with wet shoe).
Permit Information / Stipulations, Conditions of Approval
2026-06-15 (Exact confidence)
Specific regulatory sequencing requirement that constrains the order of operations for this well's completion, conditioning its permit.
Permit Information / Stipulations, Conditions of Approval
2026-06-15 (Exact confidence)
Direct condition tied to the permit's jurisdiction, triggering specific pre-construction actions and inspections.
PROPOSED WORK section
Relative (Inferred confidence)
Explicitly defines the scope of the permit modification request, which is the basis for the approval.
Permit Information / Stipulations, Conditions of Approval
Unknown (Missing confidence)
Direct linkage to a governing regulatory order authorizing the well.
Historical Context (4)
Core and sample collection mandate from Base of Last Charles Salt, with specific intervals (30' vertical/build, 200' horizontal), requiring submission to state library within 30 days of drilling completion.
Cores and Samples letter from Ross Edison · 2025-11-10
Imposes a persistent post-drilling obligation for sample handling and submission that must be fulfilled after the permitted drilling operations.
Drillback waiver request for multiple wells (including this one) due to wellbores entering the Bakken system outside the target spacing unit. Waiver granted as operator is also the operator of the adjacent unit.
DRILLBACK WAIVER document · 2025-10-23
Documents a pre-existing regulatory clearance for the non-standard wellbore trajectory that remains valid for execution.
Anticollision report identifies a 'Collision Avoidance Required' warning with offset well 'AB-Ivy Jolyn Federal 29-26H MB' at a separation factor of 1.007.
Anticollision Report Summary · 2025-10-20
Establishes an ongoing operational constraint requiring specific anti-collision procedures during drilling execution.
Surface Use Agreement in place with landowner Berniece B. Olson for off-spacing operations, effective August 1, 2025.
AFFIDAVIT of Sam Giamfortone · 2025-09-23
Represents a binding surface access agreement that remains in force for the duration of operations.
Operator Pattern
Operator utilizes detailed well design plans (wet shoe schematic), comprehensive anticollision analysis, and pre-emptively secures surface agreements and regulatory waivers.
Drilling program includes wet shoe design detail; anticollision report addresses multi-well pad risks; affidavit confirms surface agreement; drillback waiver pre-filed.
Confidence: High
The permit document (dated 2026-06-15) contains explicit stipulations and conditions of approval that directly explain the permit action. Supporting technical documents (drill program, anticollision) are date-stamped and clearly linked. Historical documents are distinct and time-bound prior to the permit.