NO COMPARISON
Well file changed - no earlier copy to compare
First detected 2026-11-25 · Full diff →

Liberty 79-2431H

EOG RESOURCES, INC. · Mountrail County, ND · File #42467 · Generated 2026-11-27 02:13

API
3306105604
Target Formation
Three Forks First Bench (B1)
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly explained by the issuance of ICO 34615, which establishes the 3200-acre spacing unit and specific setbacks. Additional contemporaneous regulatory actions (log waiver approval, pre-construction inspector contact, core/sample letter) further condition and justify the permit.

Permit Cycle Signals (4)

Approval granted under Commission Order No. 34615 for a 3200-acre spacing unit, with specific 150' N/S and 500' E/W setback conditions within the unit.
Direct
Permit Information - Stipulations
2025-11-10 (Exact confidence)
The permit is explicitly conditioned on and justified by this spacing order, defining the unit boundaries and non-standard setbacks.
Open hole log waiver approved, citing offset well Liberty 9-23 (NDIC #18971) within a mile as sufficient for formation tops, with requirement for GR-CBL from TD to surface.
Supporting
Sundry Form - Request for Consideration/Waiver (Open Hole Log Waiver)
2025-11-19 (Exact confidence)
This approved waiver modifies standard regulatory requirements for logging, justifying a deviation required for permit execution.
Regulatory stipulation requiring contact with NDIC Field Inspector Calob Were prior to location construction.
Direct
Permit Information - Conditions of Approval
2025-11-10 (Exact confidence)
A direct, non-standard regulatory condition attached to the permit approval.
Core and sample letter from State Geologist detailing specific collection requirements.
Direct
Letter from Ross Edison, Geologist
2025-11-17 (Exact confidence)
Issued prior to permit approval, it establishes a binding technical requirement that conditions well operations.

Historical Context (2)

Permit letter sent to Three Affiliated Tribes Chairman Mark N. Fox notifying of permit issuance on Fort Berthold Reservation land.
Letter to Mark N. Fox, Chairman, Three Affiliated Tribes · 2025-11-10
Establishes a formal government-to-government notification and potential consultation obligation that persists through the life of the well and may affect future permitting or relations.
Affidavit stating no diesel fuel will be used in hydraulic fracturing operations for this well and its pad mates.
Affidavit from Joel Draper · 2025-10-22
Creates a binding, sworn operational constraint on completion techniques that applies to this well and must be adhered to during future completion operations.

Operator Pattern

Operator proactively seeks waivers (open hole logs) and supplemental permits (pad moat) ahead of operational need.
Open hole log waiver requested and approved in Nov 2025; Sundry for pad moat submitted Jan 2026.
Confidence: High
Key permit-conditioning documents (ICO 34615, waiver approval, geologist letter) are clearly dated and directly reference the well. Text extraction provides clear regulatory stipulations and correspondence.