← Back to Daily Permits
OTHER
Wellfile updated - +20 pages
HERCULES 1-12-13 3H
Phoenix Operating LLC · Burke County, ND · File #42558 · Generated 2026-11-27 02:13
- API
- 3301302006
- Target Formation
- Middle Bakken
- Permit Explained
- Partially
Permit Cycle Assessment
The permit approval is directly conditioned by Commission Order 33922 setbacks and a completion design requirement (wet shoe/frac-out). A Suspension of Drilling order modifies the execution sequence. However, no contemporaneous document explicitly links the permit's 12/12/2025 approval date to the subsequent waiver requests or drilling suspension approval; those are separate, later regulatory actions.
Permit Cycle Signals (3)
Permit Stipulations section
2025-12-12 (Exact confidence)
Condition directly ties permit approval to specific geometry (setbacks) and completion design (wet shoe with frac-out capability), differentiating from routine horizontal approvals.
Suspension of Drilling Sundry (FORM ID: 296089)
2026-03-03 (Exact confidence)
Regulatory approval modifies standard drilling sequence and imposes specific operational constraint (no surface hole deviation) tied to permit execution timeline.
Cores and Samples Letter from Ross Edison
2025-12-29 (Exact confidence)
Regulatory order establishes mandatory sampling protocol that subsequent waiver requests must reference and justify deviations from.
Historical Context (3)
Tubing/Packer waiver approved based on casing burst rating, safety factor, and monitoring assurances, allowing variance from NDAC 43-02-03-21.
Tubing/Packer Waiver Sundry (FORM ID: 288127) · 2025-12-16
Permanent waiver alters standard completion design and imposes ongoing monitoring and pressure rating obligations during flowback and production.
Open hole log waiver approved based on offset well data (BRUSVEN 32-1) within one mile, with requirement for GR-CBL from TD to ground level.
Open Hole Log Waiver Sundry (FORM ID: 288123) · 2025-12-15
Permanent waiver eliminates standard open hole logging but imposes alternate logging requirement (GR-CBL) that must be executed.
Notification requirement under NDIC Order 31973 for wells entering adjacent spacing units, satisfied by operator self-notification as Phoenix Energy operates adjacent unit.
Backbuild Order Waiver letter dated 2025-11-13 · 2025-11-13
Establishes regulatory obligation for any future wells entering adjacent units and documents compliance precedent.
Operator Pattern
Proactive regulatory engagement: seeks multiple waivers (filter sock container, tubing/packer, open hole logs, sample collection, mud logging) and uses suspension of drilling for operational flexibility.
Sequential waiver requests prior to and after permit approval; suspension of drilling request to use smaller rig for surface hole; pilot project for off-site mud logging.
Confidence: Medium
Key permit conditions (setbacks, suspension approval) are clear, but the direct link between the 12/12/2025 permit approval date and subsequent 2026 waiver requests is not explicitly contemporaneous. Some dates are inferred from document context, and text extraction has minor duplication.