← Back to Daily Permits
OTHER
Permit approval is explicitly conditioned on Order No. 35267 with geotechnical justifications for modified setbacks.
Updated 2026-06-30 · was Apr 9, 2026 · +5 pages · Full diff →

RS-Bette-156-92-0128H-4

HESS BAKKEN INVESTMENTS II, LLC · Mountrail County, ND · File #42811 · Generated 2026-10-14 06:31

API
3306105673
Target Formation
Bakken
Permit Explained
Yes

Permit Cycle Assessment

Permit approval is explicitly conditioned on Order No. 35267 with geotechnical justifications for modified setbacks.

Permit Cycle Signals (3)

Approval condition: 150' setback from north & south boundaries and 1220' setback from east & west boundaries within the 2400-acre spacing unit.
Direct
Permit stipulations
2026-04-02 (Exact confidence)
Modified setback distances tied to specific well geometry.
North setback justification based on production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
Direct
Conditions of Approval
2026-04-02 (Exact confidence)
Technical justification for non-standard setback.
Ross-Bakken Pool definition from 50 feet above Bakken Formation to 50 feet below Three Forks Formation.
Direct
Permit stipulations
2026-04-02 (Exact confidence)
Regulatory pool definition conditioning permit approval.

Historical Context (2)

Permanent filter sock container requirement per NDAC 43-02-03-19.2 (effective 2014).
Regulatory letter dated 2025-05-30 · 2014-06-01
Ongoing compliance requirement for all wells.
Directional well survey frequency requirements (100ft vertical, 30ft curve, 90ft lateral).
Operator assertions · Unknown
Continuous operational constraint for all horizontal wells.

Operator Pattern

Systematic anti-collision protocols including 1.5 separation factor minimum.
Anti-collision statement detailing planning standards.
Confidence: High
Permit stipulations clearly reference Order No. 35267 and include specific geotechnical conditions.