The permit approval is directly conditioned on specific setback requirements justified by well geometry and cementing plans, with additional pre-construction notification requirements.
Updated 2026-05-26 · was Apr 14, 2026 · +1 page · Full diff →

🛢️ STATE WOLF FEDERAL 5102 43-33 2B

Whiting Oil & Gas Corporation · McKenzie County, ND · File #42815 · Generated 2026-05-26 02:39

API
3305310770
Target Formation
Bakken
Permit Explained
Yes

📋 Permit Cycle Assessment

The permit approval is directly conditioned on specific setback requirements justified by well geometry and cementing plans, with additional pre-construction notification requirements.

🔍 Permit Cycle Signals (3)

Approval conditioned on 150' setback from north & south boundaries and 500' setback from east & west boundaries within the 2560-acre spacing unit
Direct
📄 Permit Stipulations
📅 2026-04-07 (Exact confidence)
Specific setback requirements tied to well geometry and spacing unit
South setback based on production liner cemented in the lateral with a wet shoe and ability to frac out the shoe
Direct
📄 Permit Stipulations
📅 2026-04-07 (Exact confidence)
Technical justification for modified setback
Operator must contact NDIC Field Inspector prior to location construction
Direct
📄 Permit Stipulations
📅 2026-04-07 (Exact confidence)
Pre-construction regulatory oversight requirement

📖 Historical Context (3)

Surface Use Agreement executed for off-spacing surface location
📄 Affidavit Affirming Surface Use Agreement · 📅 2026-04-01
Obligation persists for all wells drilled from this pad location
Drill-back notification provided to adjacent operator
📄 Affidavit Affirming Drill-Back Notification · 📅 2025-09-25
Establishes communication protocol for future operations near unit boundaries
Anti-collision measures implemented with 1.2 separation safety factor
📄 Anti-collision Report · 📅 2025-07-30
Ongoing requirement for all future drilling in this area

🔧 Operator Pattern

Consistent compliance with off-spacing surface location requirements
Documented SUA execution and drill-back notifications
Confidence: High
All key permit conditions are explicitly documented in regulatory filings with clear dates