โ† Back to Daily Permits
OTHER
Permit approval is directly conditioned on spacing unit setbacks, wet shoe configuration justification, and specific casing evaluation requirements
Updated 2026-05-26 ยท was Apr 29, 2026 ยท Full diff โ†’

๐Ÿ›ข๏ธ JAFFA 5303 14-1 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42849 ยท Generated 2026-05-26 02:39

API
3310506819
Target Formation
Bakken
Permit Explained
Yes

๐Ÿ“‹ Permit Cycle Assessment

Permit approval is directly conditioned on spacing unit setbacks, wet shoe configuration justification, and specific casing evaluation requirements

๐Ÿ” Permit Cycle Signals (3)

Approval conditioned on 150' setback from north & south boundaries and 500' setback from east & west boundaries within the 2560-acre spacing unit
Direct
๐Ÿ“„ Permit Stipulations
๐Ÿ“… 2026-04-20 (Exact confidence)
Specific setback requirements tied to spacing unit boundaries
South setback based on production liner cemented in the lateral with a wet shoe and ability to frac out the shoe
Direct
๐Ÿ“„ Permit Stipulations
๐Ÿ“… 2026-04-20 (Exact confidence)
Technical justification for reduced south setback
CBL must be run on the 9-5/8" Dakota string prior to running 7" casing
Direct
๐Ÿ“„ Permit Conditions of Approval
๐Ÿ“… 2026-04-20 (Exact confidence)
Non-standard cement evaluation requirement

๐Ÿ“– Historical Context (2)

Drill-back notification requirement for wellbores traversing adjacent spacing units
๐Ÿ“„ Affidavit Affirming Drill-Back Notification ยท ๐Ÿ“… 2026-02-11
Creates ongoing obligation for future wells drilled from this pad that cross unit boundaries
Filter sock container requirement effective June 1, 2014
๐Ÿ“„ NDIC Regulatory Letter ยท ๐Ÿ“… 2014-06-01
Persistent waste management requirement for all future operations
Confidence: High
All key permit conditions are explicitly documented in the approval documents with clear dates and regulatory references