← Back to Daily Permits
OTHER
Permit approval is directly conditioned on spacing unit setbacks, wet shoe configuration justification, and specific casing evaluation requirements
Updated 2026-07-15 · was May 11, 2026 · +3 pages · Full diff →

🛢️ JAFFA 5303 14-1 3B

OASIS PETROLEUM NORTH AMERICA LLC · Williams County, ND · File #42849 · Generated 2026-07-15 06:25

API
3310506819
Target Formation
Bakken
Permit Explained
Yes

📋 Permit Cycle Assessment

Permit approval is directly conditioned on spacing unit setbacks, wet shoe configuration justification, and specific casing evaluation requirements

🔍 Permit Cycle Signals (3)

Approval conditioned on 150' setback from north & south boundaries and 500' setback from east & west boundaries within the 2560-acre spacing unit
Direct
📄 Permit Stipulations
📅 2026-04-20 (Exact confidence)
Specific setback requirements tied to spacing unit boundaries
South setback based on production liner cemented in the lateral with a wet shoe and ability to frac out the shoe
Direct
📄 Permit Stipulations
📅 2026-04-20 (Exact confidence)
Technical justification for reduced south setback
CBL must be run on the 9-5/8" Dakota string prior to running 7" casing
Direct
📄 Permit Conditions of Approval
📅 2026-04-20 (Exact confidence)
Non-standard cement evaluation requirement

📖 Historical Context (2)

Drill-back notification requirement for wellbores traversing adjacent spacing units
📄 Affidavit Affirming Drill-Back Notification · 📅 2026-02-11
Creates ongoing obligation for future wells drilled from this pad that cross unit boundaries
Filter sock container requirement effective June 1, 2014
📄 NDIC Regulatory Letter · 📅 2014-06-01
Persistent waste management requirement for all future operations
Confidence: High
All key permit conditions are explicitly documented in the approval documents with clear dates and regulatory references