Permit approval is directly justified by regulatory order compliance (35054), anti-collision mitigation, and drill-back coordination.
Updated 2026-05-26 ยท was Apr 29, 2026 ยท Full diff โ†’

๐Ÿ›ข๏ธ JAFFA FEDERAL 5303 14-1 5BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42851 ยท Generated 2026-05-26 02:39

API
3310506821
Target Formation
Bakken
Permit Explained
Yes

๐Ÿ“‹ Permit Cycle Assessment

Permit approval is directly justified by regulatory order compliance (35054), anti-collision mitigation, and drill-back coordination.

๐Ÿ” Permit Cycle Signals (3)

Approval conditioned on well bore alignment within the 500' drilling corridor and 150' setbacks from north & south boundaries within the 5120-acre spacing unit.
Direct
๐Ÿ“„ Permit Conditions of Approval
๐Ÿ“… 2026-04-20 (Exact confidence)
Specific geometric constraints tied to regulatory order.
Requirement to run a CBL on the 9-5/8" Dakota string prior to running 7" casing.
Direct
๐Ÿ“„ Permit Conditions of Approval
๐Ÿ“… 2026-04-20 (Exact confidence)
Unique cement evaluation requirement differentiating this permit.
Drill-back notification to adjacent operator (Devon Energy) per Order No. 31848.
Supporting
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
๐Ÿ“… 2026-02-11 (Exact confidence)
Mandatory pre-drilling coordination with offset operator.

๐Ÿ“– Historical Context (2)

Wet shoe configuration with 400' uncemented annulus around liner toe for cost-effective toe initiation.
๐Ÿ“„ Well Information Section 1.11 ยท ๐Ÿ“… Unknown
Impacts future completion techniques and requires NDIC approval for changes.
BLM federal minerals coordination required for spacing unit.
๐Ÿ“„ Email from NDIC Petroleum Engineer ยท ๐Ÿ“… 2026-04-16
Ongoing federal regulatory oversight for operations in the unit.
Confidence: High
Explicit regulatory references and dated correspondence directly anchor permit conditions.