OTHER
Permit approval is directly justified by regulatory order compliance (35054), anti-collision mitigation, and drill-back coordination.
Updated 2026-07-15 · was May 11, 2026 · +3 pages · Full diff →

🛢️ JAFFA FEDERAL 5303 14-1 5BX

OASIS PETROLEUM NORTH AMERICA LLC · Williams County, ND · File #42851 · Generated 2026-07-15 06:25

API
3310506821
Target Formation
Bakken
Permit Explained
Yes

📋 Permit Cycle Assessment

Permit approval is directly justified by regulatory order compliance (35054), anti-collision mitigation, and drill-back coordination.

🔍 Permit Cycle Signals (3)

Approval conditioned on well bore alignment within the 500' drilling corridor and 150' setbacks from north & south boundaries within the 5120-acre spacing unit.
Direct
📄 Permit Conditions of Approval
📅 2026-04-20 (Exact confidence)
Specific geometric constraints tied to regulatory order.
Requirement to run a CBL on the 9-5/8" Dakota string prior to running 7" casing.
Direct
📄 Permit Conditions of Approval
📅 2026-04-20 (Exact confidence)
Unique cement evaluation requirement differentiating this permit.
Drill-back notification to adjacent operator (Devon Energy) per Order No. 31848.
Supporting
📄 Affidavit Affirming Drill-Back Notification
📅 2026-02-11 (Exact confidence)
Mandatory pre-drilling coordination with offset operator.

📖 Historical Context (2)

Wet shoe configuration with 400' uncemented annulus around liner toe for cost-effective toe initiation.
📄 Well Information Section 1.11 · 📅 Unknown
Impacts future completion techniques and requires NDIC approval for changes.
BLM federal minerals coordination required for spacing unit.
📄 Email from NDIC Petroleum Engineer · 📅 2026-04-16
Ongoing federal regulatory oversight for operations in the unit.
Confidence: High
Explicit regulatory references and dated correspondence directly anchor permit conditions.