OTHER
The permit approval is explicitly conditioned on adherence to Order 35207 and standard stipulations (setbacks, notification). Documents show surface use agreement in place and that offset operators Devon were notified of directional plans.
๐ข๏ธ RS-Piepkorn-155-92-1208H-3
HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42852 ยท Generated 2026-05-26 02:39
- API
- 3306105680
- Target Formation
- BAKKEN
- Permit Explained
- Yes
๐ Permit Cycle Assessment
The permit approval is explicitly conditioned on adherence to Order 35207 and standard stipulations (setbacks, notification). Documents show surface use agreement in place and that offset operators Devon were notified of directional plans.
๐ Permit Cycle Signals (6)
๐ Permit Stipulations
๐
Unknown (Missing confidence)
Approval is explicitly tied to Order 35207, indicating that the order contains stipulations or authorizations relevant to this permit.
๐ Permit Stipulations
๐
Unknown (Missing confidence)
Specific setback requirements tied to spacing unit and cement isolation.
๐ Permit Stipulations
๐
Unknown (Missing confidence)
Specific notification requirement.
๐ Page 2
๐
2026-04-21 (Exact confidence)
Constrains well placement based on directional plan.
๐ Drilling Permit Affidavit
๐
2026-03-25 (Exact confidence)
States that offset operator Devon was notified about drilling plans.
๐ AFFIDAVIT
๐
2026-03-23 (Exact confidence)
Establishes that Hess has the right to 'Use, occupy, construct, maintain, repair and replace well sites' on the Evonne Piepkom property.
๐ Historical Context (3)
Remote or automatic shutoff devices are required on all equipment
๐ Permit Stipulations ยท ๐
Unknown
This requirement persists for the life of the well.
To protect near surface groundwater any conductor, rat, or mouse hole drilled must be constructed with a string of casing and cemented to ground level.
๐ Page 2 ยท ๐
2026-04-21
This construction requirement persists.
A covered leak-proof container (with placard) for filter sock disposal must be maintained on the well site beginning when the well is spud, and must remain on-site during clean-out completion, and flow-back whenever filtration operations are conducted.
๐ Leak Proof Container Required ยท ๐
2014-05-30
This requirement persists during relevant operations.
๐ง Operator Pattern
Hess is using cemented plugs for completions.
The RS-PIEPKORN-155-92-1208H-3 estimated spud date is April 24, 2027 and Hess plans to complete the well as cemented plug and perf completions.
Confidence: High
Multiple supporting documents.